01/21/2024
Bathroom remodel 2 of 2 in this condo renovation. We replaced the old rusting tub with a new Acrylic bathtub, followed by waterproofing and large 16"x32" tiles around the tub walls and ceiling which minimizes grout joints. Extra time is spent laying out tiles before installing them to get a continuous flow of the veining whenever possible. 18"x18" matte black tiles were installed on the bathroom floor which accents the veining from the wall tiles. The tub/shower received a frameless roller glass door and we finished off the bathroom with a new vanity and quartz countertop.