09/30/2021
Final structural steel review at EPCOR's Poundmaker substation. The transformer (shown sitting on the concrete pad) will step down the voltage from 240 kV to 72 kV. Overhead power lines will exit the substation from the top of that gigantic A-frame structure and carry electricity to the Meadowlark substation.