Eastern Valley Electric delivering the power with this 350 Kilowatt back up Generator. In a power outage it can be essential to keep life safety system operational! 💪⚡️
Our in house pre construction design reviews were able to identify life safety equipment not detailed on emergency back up. This allowed us to engage the GC early enough to ensure there were no delays or downtime to their project while a larger generator was implemented into the build!
Experience ✅
Proactive ✅
Schedule in tact ✅
Supply & install ✅
At E.V.E we believe in providing more than just an “as per drawing” installation service. It’s about building trust, showcasing experience and providing an experience to our clients that is second to none… this is the Eastern Valley way✊🫡