π’ Calgary Rezoning Update
π¨ Key Dates π¨
Based on Development approvals timelines, applications received after the following dates will be reviewed based on their August 4, 2026 zoning decision.
π May 4, 2026: Rowhouse, Townhouse, Courtyard Development, Contextual Single Detached Dwelling, Single Detached Dwelling, Contextual Semi-detached Dwelling, Semi-detached Dwelling, Duplex Dwelling, and Discretionary Backyard Suites
π June 6, 2026: Standalone Secondary Suites, proposed relaxation(s), permitted Backyard Suites
π July 6, 2026: Permitted Secondary Suites (without relaxation)
Note: Applications submitted after these dates will have to either change their proposal or apply to rezone the property.
π¨ Approved changes to the R-CG zone that will apply to future developments after August 4, 2026:
β Maximum height is lowered from 11m to 10m.
β Maximum lot coverage is lowered from 60% to 55%.
β Zero lot line developments are no longer allowed.
β Rowhouses that meet all rules can be a permitted use in R-CG again, same as prior to the citywide rezoning in 2024.
π¨ Additional Changes might come in place in the coming weeks.
ποΈ How Tricor Design Group Can Help
At Tricor, we are already helping our clients adapt and move forward by:
β Identifying the best zoning strategy (R-CG, M-CG, H-GO, or rezoning paths)
β Fast-tracking DP submissions within the transition window
β Designing projects that align with new bylaw limits and city expectations
β Navigating approvals with strong planning rationale and experience
π‘ Bottom line:
Opportunities in Calgary are still strong β they just require smarter strategy, faster action, and the right team.
If youβre planning a project or unsure how these changes affect your land, reach out to us β weβre here to help you move forward with confidence.
β Tricor Design Group