08/27/2026
Our team has completed the substrate preparation and applied the base coat for this membrane repair.
Proper preparation is critical to achieving strong adhesion, membrane continuity, and long-term performance under constant vehicular traffic and abrasion.
Next step application of the top coat to complete the traffic membrane system and provide the final protective wearing surface.
ConcreteProtection