Kevin Patterson Construction

Kevin Patterson Construction A construction company dealing with interlock and machine work.

Deck extension with a pergola. Concrete poured for swim spa and 400 sq ft of interlock laid.
07/03/2025

Deck extension with a pergola. Concrete poured for swim spa and 400 sq ft of interlock laid.

11/21/2024
Removal of all front yard grass and cedar mulch installed.  Install of  6" of concrete for 180 sq of flagstone. 4 natura...
11/06/2024

Removal of all front yard grass and cedar mulch installed. Install of 6" of concrete for 180 sq of flagstone. 4 natural stone steps installed with concrete base. 265 sq ft of flagstone in amboise beige for walkway to existing deck.

Backyard deck and shed moving. New concrete pad poured and shed moved 90 degrees. 360 sq ft deck built using PT lumber. ...
11/06/2024

Backyard deck and shed moving. New concrete pad poured and shed moved 90 degrees. 360 sq ft deck built using PT lumber. 27 yards of soil brought to site and graded and sod laid.

Laying of 200 sq ft   Eva chestnut brown and 65 ln ft of   gardina wall.
11/06/2024

Laying of 200 sq ft Eva chestnut brown and 65 ln ft of gardina wall.

Backfilling and grading of 1800 sq ft. Sod to come in soon!
11/06/2024

Backfilling and grading of 1800 sq ft. Sod to come in soon!

Armour stone, river rock and plants added to existing interlock pad.
11/06/2024

Armour stone, river rock and plants added to existing interlock pad.

Lifting of concrete slabs for deck stair grade. Tear down of existing deck and install of PT deck with 15" steps.
11/06/2024

Lifting of concrete slabs for deck stair grade. Tear down of existing deck and install of PT deck with 15" steps.

Tore down an existing pressure treated wood wall and built a new retaining wall for the garden. Wall stone - Best Way St...
04/10/2024

Tore down an existing pressure treated wood wall and built a new retaining wall for the garden. Wall stone - Best Way Stone Parkwall beige mix with Oaks Ortana onyx coping

11 000 sq ft of sod laid in on December 16th. Soil scraped down to sub grade and new screeded topsoil to bring it back u...
02/08/2024

11 000 sq ft of sod laid in on December 16th. Soil scraped down to sub grade and new screeded topsoil to bring it back up. 8 day project perfectly timed in-between snow and rain.

Install of permacon kensington paver with onxy border. Building of pressure treated steps and sod
02/08/2024

Install of permacon kensington paver with onxy border. Building of pressure treated steps and sod

02/08/2024

Install of oaks rialto 50mm and 80mm with mega melville steps

Address

Bolton, ON
L7E3K6

Alerts

Be the first to know and let us send you an email when Kevin Patterson Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Kevin Patterson Construction:

Share

Category