06/05/2026
What an honour to complete a repair on a building with such history and presence. Originally built in 1889, it has witnessed generations of change and stood as a landmark in the Alliston community for well over a century. Contributing to its preservation through repairs to the pier beside the front entrance on the north elevation was a great privilege. 🇨🇦🧱⚒️ For a building of this age and significance, using the proper materials is essential. The repair was completed using King Sika HLM 500, a natural hydraulic lime mortar selected to better match the performance and character of the historic masonry.