08/27/2026
Nearly 75% of Canadian construction projects go over budget.
In Toronto, renovations regularly rise 20 to 50% once construction begins.
The cause almost never gets talked about honestly: incomplete drawings at tender. When a contractor prices a job from drawings that still have unresolved details, they fill the gaps with assumptions. When those assumptions change on site, the contract price changes with them.
The fix isn’t a lower budget — it’s a better drawing set. Complete, coordinated documentation before you tender is the single most effective protection against construction surprises.
That’s what architects do. Not just design — document. So the number on your contract reflects reality.
Full breakdown at the link in bio.
—
™