24/03/2026
🔧 Scope of Work Executed:
1. Civil & Surface Preparation
• Floor leveling and substrate preparation for stone installation
• Wall surface correction with plaster/putty for true alignment
• Groove and channel provision for electrical conduits
2. Electrical & MEP Coordination
• Pre-planned wiring layout integrated with false ceiling design
• Provision for recessed lighting, cove lighting, and power points
• Load distribution planning for uniform illumination
3. False Ceiling System (Gypsum/P.O.P)
• Multi-layered ceiling design with recessed panels
• Integrated LED cove lighting for indirect illumination
• Cut-outs for spotlights and service access points
• Proper suspension framework ensuring level accuracy
4. Flooring Installation
• Premium marble/stone flooring laid with precise joint alignment
• Surface polishing for high reflectivity and uniform finish
• Slope and level checks to avoid water stagnation
5. Joinery & Built-in Furniture
• Custom cabinetry with modular internal divisions
• Alignment with wall paneling and elevation design
• Hardware integration (hinges, channels, handles)
6. Wall Paneling & Finishes
• Decorative wall moldings for architectural depth
• Smooth paint finish with multiple coats (primer + topcoat)
• Edge detailing and joint finishing for seamless look
7. Lighting Design Ex*****on
• Combination of ambient, task, and accent lighting
• Symmetrical spotlight placement for balanced illumination
• Concealed LED strips enhancing ceiling geometry
⸻
📐 Key Engineering Considerations:
• Level accuracy across flooring and ceiling planes
• Proper spacing and load handling of ceiling framework
• Thermal management and accessibility for lighting fixtures
• Coordination between civil, electrical, and carpentry teams
• Finishing tolerances to achieve seamless joints and edges