15/06/2026
āĻāĻāĻāĻž āĻŦāĻŋāϞā§āĻĄāĻŋāĻ āĻĒā§āϰāĻā§āĻā§āĻā§āϰ āĻāϤ āĻĒāĻžāϰā§āϏā§āύā§āĻ āĻĒā§āϰā§āĻā§āϰā§āϏ āĻāĻŋāĻāĻžāĻŦā§ āĻšāĻŋāϏāĻžāĻŦ āĻāϰāĻŦā§āύ?
āĻāĻāĻāĻž āĻŦāĻŋāϞā§āĻĄāĻŋāĻ āĻĒā§āϰāĻā§āĻā§āĻā§āϰ āĻŦāĻŋāĻāĻŋāύā§āύ āĻ
āĻāĻļā§āϰ āĻā§āύāĻāĻŋāϰ āĻāϤ āĻĒāĻžāϰā§āϏā§āύā§āĻā§ āĻŽāĻŋāϞ⧠āĻŽā§āĻ ā§§ā§Ļā§Ļ% āĻšā§, āĻāĻ āϤāĻĨā§āϝ āĻāĻžāύāĻž āĻĨāĻžāĻāϞ⧠āϏāĻšāĻā§āĻ āĻāĻĒāύāĻžāϰ āĻĒā§āϰāĻā§āĻā§āĻā§āϰ āĻĒā§āϰā§āĻā§āϰā§āϏ āĻāϤ āĻĒāĻžāϰā§āϏā§āύā§āĻ āϏā§āĻāĻž āĻāĻžāύāϤ⧠āĻĒāĻžāϰāĻŦā§āύāĨ¤ āĻāĻāĻžā§āĻžāĻ āĻĒā§āϰāĻā§āĻā§āĻ āĻļā§āώ āĻšāϤ⧠āĻāϰ⧠āĻāϤ āϏāĻŽā§ āϞāĻžāĻāĻŦā§ āĻāĻŋāĻāĻŦāĻž āĻāϰ⧠āĻāϤ āĻāĻžāĻāĻž āĻāϰāĻ āĻšāϤ⧠āĻĒāĻžāϰ⧠āĻāϤā§āϝāĻžāĻĻāĻŋ āĻŦāĻŋāώ⧠āϏāĻšāĻā§ āĻŦā§āϰ āĻāϰāϤ⧠āĻĒāĻžāϰāĻŦā§āύāĨ¤
āϧāϰā§āύ āĻāĻĒāύāĻžāϰ āĻŦāĻŋāϞā§āĻĄāĻŋāĻ āĻāĻžāĻā§āϰ āϏāĻŽā§āĻĒā§āϰā§āĻŖ āϏā§āĻā§āϰāĻžāĻāĻāĻžāϰāĻžāϞ āĻāĻžāĻ āϝāĻĻāĻŋ āĻļā§āώ āĻšā§ā§ āĻĨāĻžāĻā§ āϤāĻžāĻšāϞ⧠āĻŦāϞāĻž āϝā§āϤ⧠āĻĒāĻžāϰ⧠āĻŽā§āĻ āĻāĻžāĻā§āϰ ā§Šā§Ģ% āĻļā§āώ āĻšā§ā§āĻā§āĨ¤
āĻāĻŋāĻāĻŦāĻž āϧāϰā§āύ āϏā§āĻā§āϰāĻžāĻāĻāĻžāϰāĻžāϞ āĻāĻžāĻā§āϰ āĻŽāϧā§āϝ⧠āĻļā§āϧ⧠āĻĢā§āĻāĻŋāĻ āĻ āĻļāϰā§āĻ āĻāϞāĻžāĻŽ āĻāϰ āĻāĻžāĻ āĻļā§āώ āĻšā§ā§āĻā§ āϤāĻžāĻšāϞ⧠āĻŦāϞāϤ⧠āĻĒāĻžāϰā§āύ āϏā§āĻā§āϰāĻžāĻāĻāĻžāϰāĻžāϞ āĻāĻžāĻā§āϰ ⧍ā§Ļ% āĻļā§āώ āĻšā§ā§āĻā§āĨ¤
āĻāĻāĻžāĻŦā§ āϝā§āĻā§āύ āĻ
āĻāĻļā§āϰ āĻāĻžāĻā§āϰ āĻļā§āώ⧠āĻĒā§āϰā§āĻā§āϰā§āϏ āĻŦā§āϰ āĻāϰāϤ⧠āĻĒāĻžāϰāĻŦā§āύ
āĻŦāĻŋāϏā§āϤāĻžāϰāĻŋāϤāĻ
=======
āĻŦāĻŋāϞā§āĻĄāĻŋāĻ āĻāϰ āĻŦāĻŋāĻāĻŋāύā§āύ āĻ
āĻāĻļā§āϰ āĻā§āύāĻāĻŋ āĻāϤ āĻĒāĻžāϰā§āϏā§āύā§āĻ āĻāĻžāĻ āĻŦāĻšāύ āĻāϰā§:
1. Structure = 35%
2. Brick work = 6%
3. Wood work = 5%
4. Metal work = 2%
5. Plambing and Sanitary = 6%
6. Electrical work = 7%
7. Plaster work = 4%
8. General Floor Tiles work = 6%
9. Toilet & Kit wall Tiles work = 3%
10. Aluminium work = 4%
11. Lift,Generator,Substation=10%
12. Paint work = 3%
13. Others civil work = 6%
14. Utility connection & Bill = 3%
Total = 100%
āĻāĻŦāĻžāϰ āĻāϏā§āύ āϏā§āĻā§āϰāĻžāĻāĻāĻžāϰ āĻ
āĻāĻļā§āϰ āĻ¯ā§ ā§Šā§Ģ% āĻŦāϞāĻž āĻšāϞā§, āϏā§āĻ ā§Šā§Ģ% āĻ
āĻāĻļā§āϰ āĻŽāϧā§āϝ⧠āĻāĻŦāĻžāϰ āĻŦāĻŋāĻāĻŋāύā§āύ āĻ
āĻāĻļā§āϰ āĻā§āύāĻāĻž āĻāϤ āĻĒāĻžāϰā§āϏā§āύā§āĻ āĻĻā§āĻāĻž āϝāĻžāĻāĨ¤
âī¸STRUCTURE : 35%
- Footing & Column Padestal = 20%
- Grade Beam, UGWR top Slab = 5%
- GF Column, Stair etc = 4%
- 1st Floor Slab = 9%
- Typical Floor Column (5x3%) = 15%
- 2nd floor slab to roof slab (5x8) = 40%
- Roof top = 7%
TOTAL = 100% (āĻŽā§āĻ āĻ
āĻāĻļā§āϰ 35%)
âī¸BRICK WORK : 6%
- GF Brick work = 6%
- 1st floor Brick work = 18%
- 2nd floor Brick work = 18%
- 3rd floor Brick work = 18%
- 4th floor Brick work = 18%
- 5th floor Brick work = 18%
-Roof Top Brick work = 4%
TOTAL = 100% (āĻŽā§āĻ āĻ
āĻāĻļā§āϰ 6% )
âī¸WOOD WORK : 5%
- Door frame = 40%
- Main Door Shutter = 15%
- Partex Door Shutter = 35%
- Cat Door & Accessories = 10%
TOTAL = 100% (āĻŽā§āĻ āĻ
āĻāĻļā§āϰ ā§Ģ% )
âī¸METAL WORK ~ 2%
- Window grill = 55%
- Verandah Railling = 20%
- Stair Railling = 10%
- Main gate, Gen-Sub, safety grill = 15%
TOTAL = 100% (āĻŽā§āĻ āĻ
āĻāĻļā§āϰ ⧍% )
âī¸PLAMBING & SANITARY : 6%
- uPVC vertical line thru duct = 25%
- GI line work = 30%
- Fixture & Fittings = 40%
- Ground Floor = 5%
TOTAL = 100% (āĻŽā§āĻ āĻ
āĻāĻļā§āϰ ā§Ŧ% )
âī¸ELECTRICAL~ 7%
- Conduiting inside slab = 10%
- Conduiting on wall i/c MK box=15%
- Cabling work = 55%
- Switch-Socket = 20%
TOTAL = 100% (āĻŽā§āĻ āĻ
āĻāĻļā§āϰ ā§% )
âī¸PLASTER ~ 4%
- Ceiling plaster = 20%
- Internal wall plaster = 50%
- Outside plaster/facing bricks = 30%
TOTAL = 100% (āĻŽā§āĻ āĻ
āĻāĻļā§āϰ ā§Ē% )
âī¸GENERAL FLOOR TILES ~ 6%
- General floor & Verandah = 75%
- Stair, typical lobby & lift wall = 20%
- GF lift lobby, wall, reception = 5%
TOTAL = 100% (āĻŽā§āĻ āĻ
āĻāĻļā§āϰ ā§Ŧ% )
âī¸TOILET & KIT WALL TILES ~ 3%
- Bath wall = 60%
- Kitchen wall = 20%
- Bath floor = 9%
- Bath counter top = 4%
- Kitchen floor = 3%
- Kitchen counter top =4%
TOTAL = 100% (āĻŽā§āĻ āĻ
āĻāĻļā§āϰ ā§Š% )
âī¸ALUMINIUM WORK ~ 4%
- Outer framing-window sliding= 40%
- Glass shutter-window sliding = 30%
- Verandah sliding = 20%
- Toilet high window = 5%
- Comnon area = 5%
TOTAL = 100% (āĻŽā§āĻ āĻ
āĻāĻļā§āϰ ā§Ē% )
âī¸EME ~ 10%
- Lift = 50%
- Generator = 25%
- Substation = 20%
- PABX, Fire extinguisher etc = 5%
TOTAL = 100% (āĻŽā§āĻ āĻ
āĻāĻļā§āϰ ā§§ā§Ļ% )
âī¸PAINT WORK ~ 3%
- Upto putty = 40%
- Internal wall&ceiling 1st coat= 20%
- Internal wall&ceiling 2nd coat= 15%
- Outside paint/ceramic Tites = 25%
TOTAL = 100% (āĻŽā§āĻ āĻ
āĻāĻļā§āϰ ā§Š% )
âī¸OTHERS CIVIL WORK ~ 6%
- Boundary wall = 30%
- Line terracing/Roof top paver= 15%
- LOGO, Gardening & others = 4%
- GF BBC = 14%
- GF pavement & footpath dev = 10%
- Lintel, F/slab, drop wall, counterslab = 20%
- Cable tray = 1%
- Sanitary duct cover, ceiling etc= 4%
- Reception desk, letter box = 2%
TOTAL = 100% (āĻŽā§āĻ āĻ
āĻāĻļā§āϰ ā§Ŧ% )
âī¸Utility connection = 15%
- Utility = 30%
TOTAL = 100% (āĻŽā§āĻ āĻ
āĻāĻļā§āϰ ā§Š% )
āĻ āĻĨā§āĻā§ āϏāĻšāĻā§āĻ āĻāĻāĻāĻž āĻĒā§āϰāĻā§āĻā§āĻā§āϰ āĻĒā§āϰā§āĻā§āϰā§āϏ āĻāϤ % āĻŦāϞāϤ⧠āĻĒāĻžāϰāĻŦā§āύāĨ¤
#āĻāĻā§āĻāĻŋāύāĻŋā§āĻžāϰāĻŋāĻ_āĻāĻŋāĻĒāϏ #āĻāĻžāĻĻāĻĸāĻžāϞāĻžāĻ #āϏāĻŋāĻāĻŋāϞāĻāĻā§āĻāĻŋāύāĻŋā§āĻžāϰ #āύāĻŋāϰā§āĻŽāĻžāύāĻāĻžāĻ #āϰāĻĄā§āϰ_āĻšāĻŋāϏāĻžāĻŦ #āĻŦāĻŋāϞā§āĻĄāĻŋāĻ_āĻāύā§āϏāĻā§āϰāĻžāĻāĻļāύ