Engineer Ruhul Amin

Engineer Ruhul Amin "đŸ—ī¸ Building Dreams, One Design at a Time "

05/05/2024

FAR āĻāϰ āĻ•ā§āϝāĻžāϞāϕ⧁āϞ⧇āĻļāύāσ
āĻŽāύ⧇ āĻ•āϰāĻŋ, āφāĻĒāύāĻžāϰ āϜāĻžā§ŸāĻ—āĻžāϰ āĻĒāϰāĻŋāĻŽāĻžāύ- ā§Ģ āĻ•āĻžāĻ āĻž,
āϜāĻžā§ŸāĻ—āĻž āĻ˜ā§‡āώ⧇ āϏāĻžāĻŽāύ⧇ āĻĻāĻŋā§Ÿā§‡ āĻ•āĻ¨ā§āϟāĻŋāύāĻŋ⧟āĻžāϏ āϰ⧋āĻĄ āϗ⧇āϛ⧇ - ⧍ā§Ļ āĻĢ⧁āϟ,
āĻĢāĻžāϰ- ā§Š.ā§Ģ ( BNBC āϤ⧇ āĻĒāĻžāĻŦ⧇āύ āĻ•āϤ āĻ•āĻžāĻ āĻžāϰ āϜāĻ¨ā§āϝ āĻ•āϤ āĻĢāĻžāϰ)
āĻāĻ–āύ, Maximum Build Area (M.B.A)= Area of Land x Far
= 5 katha x 3.5 (Here, FAR= 3.5)
= 5x(720)x3.5 ( 1 katha=720 sft)
= 3600x3.5
=12600 sft
Maximum Ground Coverage(M.G.C)- 62.5% (BNBC āϤ⧇ āĻĒāĻžāĻŦ⧇āύ)
= 5 katha x 62.5%
= (5x 720) x 62.5%
= 2250 sft.
Now, Number of Floor (N.O.F)= MBA / MGC
= 12600 / 2250
= 5.6 Floor
Total Floor = Ground Floor + 5.6 Floor
= 1+ 5.6 Floor
= 6.6 Floor

13/03/2024

Site visit at Gazipur.
Area: 1,70,000 Sft
Usage: RMG Factory

04/03/2024
19/02/2024

Our service :

> Industrial Building
> Commercial Building
> Warehouses
> Shipyard/ Shed with EOT Cranes of Different Capacity
> Power Plant Sheds
> Poultry and Dairy Farms
> Brick Manufacturing Plant
> Steel Foot Over Bridge
> Steel Stairs ......................... and so more.

If you have any interest in constructing the above noted type of structures, please do call us (@ 01834-861944 or, @ 01841999866) and we will offer you the most competitive price, on time delivery and quality as per your requirements.

14/02/2024

Site Visit.
Project : Hydra textile Ltd.
Location: Narsingdhi.
For any quarry :
✆ 01834861944

14/02/2024

Detailing of staircase


13/02/2024

Site Visit.
Project : Baizid Chemical Ltd.
Location: Narsingdhi.
For any quarry :
✆ 01834861944

Send a message to learn more

06/02/2024

āφāĻŽāϰāĻž āφāϜ āĻļāĻŋāĻ–āĻŦā§‹ āĻāĻ•āϟāĻž āĻŦāĻŋāĻ˛ā§āĻĄāĻŋāĻ‚ āĻāϰ āϏāĻ•āϞ āφāχāĻŸā§‡āĻŽ āĻŽāĻŋāϞ⧇ ā§§ā§Ļā§Ļ% āĻ•āĻŋāĻ­āĻžāĻŦ⧇ āĻ­āĻžāĻ— āĻ•āϰāĻž āĻšā§ŸāĨ¤
āωāĻ¤ā§āϤāϰ:-
1. Structure = 35%
2. Brick work = 6%
3. Wood work = 5%
4. Metal work = 2%
5. Plambing and Sanitary = 6%
6. Electrical work = 7%
7. Plaster work = 4%
8. General Floor Tiles work = 6%
9. Toilet & Kit wall Tiles work = 3%
10. Aluminium work = 4%
11. EME (Lift, Generator, Substation)
= 10%
12. Paint work = 3%
13. Others civil work = 6%
14. Utility connection & Bill = 3%
Total = 100%

STRUCTURE 35%
- Footing & Column Padestal = 20%
- Grade Beam, UGWR top Slab = 5%
- GF Column, Stair etc = 4%
- 1st Floor Slab = 9%
- Typical Floor Column (5x3%) = 15%
- 2nd floor slab to roof slab (5x8)
= 40%
- Roof top = 7%
TOTAL = 100%

BRICK WORK 6%
- GF Brick work = 6%
- 1st floor Brick work = 18%
- 2nd floor Brick work = 18%
- 3rd floor Brick work = 18%
- 4th floor Brick work = 18%
- 5th floor Brick work = 18%
-Roof Top Brick work = 4%
TOTAL = 100%

WOOD WORK 5%
- Door frame = 40%
- Main Door Shutter = 15%
- Partex Door Shutter = 35%
- Cat Door & Accessories = 10%
TOTAL = 100%

METAL WORK 2%
- Window grill = 55%
- Verandah Railling = 20%
- Stair Railling = 10%
- Main gate, Gen-Sub, safety grill
= 15%
TOTAL = 100%

PLAMBING & SANITARY 6%
- uPVC vertical line thru duct = 25%
- GI line work = 30%
- Fixture & Fittings = 40%
- Ground Floor = 5%
TOTAL = 100%

ELECTRICAL - 7%
- Conduiting inside slab = 10%
- Conduiting on wall i/c MK box=15%
- Cabling work = 55%
- Switch-Socket = 20%
TOTAL = 100%

PLASTER 4%
- Ceiling plaster = 20%
- Internal wall plaster = 50%
- Outside plaster/facing bricks = 30%
TOTAL = 100%

GENERAL FLOOR TILES 6%
- General floor & Verandah = 75%
- Stair, typical lobby & lift wall = 20%
- GF lift lobby, wall, reception = 5%
TOTAL = 100%

TOILET & KIT WALL TILES = 3%
- Bath wall = 60%
- Kitchen wall = 20%
- Bath floor = 9%
- Bath counter top = 4%
- Kitchen floor = 3%
- Kitchen counter top =4%
TOTAL = 100%

ALUMINIUM WORK 4%
- Outer framing-window sliding= 40%
- Glass shutter-window sliding = 30%
- Verandah sliding = 20%
- Toilet high window = 5%
- Comnon area = 5%
TOTAL = 100%

EME 10%
- Lift = 50%
- Generator = 25%
- Substation = 20%
- PABX, Fire extinguisher etc = 5%
TOTAL = 100%

PAINT WORK = 3%
- Upto putty = 40%
- Internal wall&ceiling 1st coat= 20%
- Internal wall&ceiling 2nd coat= 15%
- Outside paint/ceramic Tites = 25%
TOTAL = 100%

OTHERS CIVIL WORK = 6%
- Boundary wall = 30%
- Line terracing/Roof top paver= 15%
- LOGO, Gardening & others = 4%
- GF BBC = 14%
- GF pavement & footpath dev = 10%
- Lintel, F/slab, drop wall, counter
slab = 20%
- Cable tray = 1%
- Sanitary duct cover, ceiling etc= 4%
- Reception desk, letter box = 2%
TOTAL = 100%

UTILITY CONNECTION & BILL = 3%
- DESA/DESCO = 35%
- TITAS = 20
- WASA = 15%
- Utility bills = 30%
TOTAL = 100%

Meeting with G. S. Hasssan Chowdhury (TAMIM)Board of Director (Abahoni Cricket Academy) about an upcoming project.
03/02/2024

Meeting with G. S. Hasssan Chowdhury (TAMIM)
Board of Director (Abahoni Cricket Academy) about an upcoming project.

Address

Pallabi
Dhaka
1216

Alerts

Be the first to know and let us send you an email when Engineer Ruhul Amin posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Engineer Ruhul Amin:

Share