Come behind-the-scenes with us on a recent hard slat cover install with the Narellan Pools Australia Wollondilly & Southern Highlands team. This fibreglass pool had a concrete pit constructed behind to house the hard cover, including a custom cut-away to make the system work.
Big credit to Scott (builder) for setting it up right from the start.
From there, the Daisy team handled the fit-out: mounting the underwater roller, ran cabling to the controller, installed the flush mount beam system, then floated and commissioned the cover so it runs seamlessly.
The Details
• Underwater pit-mounted roller
• Solar Golden polycarbonate slats (13m x 3.474m)
• Separate drop-in step + spa section
• 5-beam system: 3 stainless steel beams wider to suit the concrete pit plus 2 more narrower beams to cover the transition of pit to pool
Then it was over to the landscapers to lay the pavers directly over the flushmount beams for a smooth finish all round.