Civil CS

Call Directions Website Contact the business

Civil CS Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Civil CS, Construction Company, Dunoon Road, Tullera.

Design and Construction company that completes works in:
Waterways
Bridges
Roads
Water Pipelines
Sewer
Drainage Works
Earthworks
Retaining Structures
Slope Stabilisation
Subdivisions

πŸš΅πŸ½πŸš΄πŸ½β€β™€οΈWoodburn to Evans Head Shared Pathway – From the River to the Sea πŸš΄πŸ½β€β™€οΈπŸš΅πŸ½The Woodburn to Evans Head Shared Pathwa...
18/09/2026

πŸš΅πŸ½πŸš΄πŸ½β€β™€οΈWoodburn to Evans Head Shared Pathway – From the River to the Sea πŸš΄πŸ½β€β™€οΈπŸš΅πŸ½
The Woodburn to Evans Head Shared Pathway is steadily taking shape, creating a new connection between the two communities and a great way to experience this beautiful part of the Northern Rivers on foot or by bike.
When complete, the pathway will stretch approximately 5.8 kilometres from Woodburn towards Evans Head, winding through the peaceful rural landscape between the river and the coast. Along the way, users will pass farmland and rural homesteads, with the new pathway providing a safe and accessible route for walkers, runners and cyclists to enjoy.
Construction Progress
CivilCS has now completed a substantial portion of the concrete pathway, and our crews are continuing to work their way along the route.
Current works are focused on some of the more complex sections of the project, including bridge and culvert works in areas where existing waterways and drainage need to be carefully managed.
These structures form an important part of the project, allowing the pathway to cross natural drainage lines while maintaining water flow and protecting the surrounding landscape.
As each new section is completed, the vision for the pathway becomes a little easier to see – a continuous recreational connection through the countryside from the river towards the sea.
Thank You, Woodburn!
Working through rural areas inevitably means construction activity, machinery movements and some temporary disruption.
CivilCS would like to thank local residents, adjoining landholders and the wider community for their continued patience and support while these works are underway.
We look forward to sharing more progress as we move closer to completion and to seeing the community out walking, running and riding the finished pathway.

πŸš§πŸ‘·πŸ½β€β™‚οΈBayshore Roundabout Works CompleteπŸ‘·πŸ½β€β™‚οΈπŸš§CivilCS is pleased to have completed construction of the new Bayshore Driv...
17/09/2026

πŸš§πŸ‘·πŸ½β€β™‚οΈBayshore Roundabout Works CompleteπŸ‘·πŸ½β€β™‚οΈπŸš§
CivilCS is pleased to have completed construction of the new Bayshore Drive roundabout in Byron Bay for Byron Shire Council, facilitating access to the new Lot 12 Access Road and Byron Bay Fair.
Located on Bayshore Drive opposite Byron Bay Fair, the project involved construction of the new roundabout along with associated drainage, electrical and landscaping works, improving access to this growing precinct, which is also home to the newly constructed NSW TAFE facility.
The works required significant temporary traffic modifications along Bayshore Drive throughout construction. Careful staging of the works allowed us to maintain access to both the Byron Bay Fair/IGA precinct and TAFE, helping to minimise disruption to local businesses, students, staff and the wider community.
CivilCS would like to thank Byron Shire Council and project superintendent Planit Consulting for their collaboration throughout the delivery of the project. We also thank local businesses, residents and road users for their patience and cooperation while the works were underway.
Another local project complete and open for the community.🚘

🚧 Works Commenced: Woodburn to Evans Head Shared Pathway πŸšΆβ€β™€οΈπŸš΄β€β™‚οΈCivilCS is excited to announce that works have commence...
06/11/2025

🚧 Works Commenced: Woodburn to Evans Head Shared Pathway πŸšΆβ€β™€οΈπŸš΄β€β™‚οΈ

CivilCS is excited to announce that works have commenced on the Woodburn to Evans Head Shared Pathway, delivered in partnership with Richmond Valley Council.

Construction will start in October 2025 and is expected to be completed by mid to late 2026. The project includes a 5.8 km, 2.5 m wide concrete path running from Alfred Street, Woodburn to Riverside Village β€” providing a safer and more accessible route for pedestrians and cyclists.

During construction, some driveway access may be temporarily affected. We’ll contact affected residents directly and do our best to provide alternative access options.

We’re committed to keeping the community informed β€” updates will be shared here and on our website: www.civilcs.com.au

If you have questions or feedback, visit us onsite at our depot off Alfred Street in Woodburn or contact us at πŸ“§ [email protected]

🚨 WE'RE HIRING – Junior Labourer / Trainee Pipelayer πŸ‘·β€β™‚οΈKeen to get into civil construction? This is your chance to sta...
24/09/2025

🚨 WE'RE HIRING – Junior Labourer / Trainee Pipelayer πŸ‘·β€β™‚οΈ
Keen to get into civil construction? This is your chance to start from the ground up β€” no experience needed!

CivilCS is looking for motivated people who are ready to learn, work hard, and build a real career in the industry.

βœ… Full-time work
βœ… On-the-job training provided with paid study time
βœ… Great team & supportive environment
βœ… Long-term career opportunities
βœ… Local projects

If you’ve got a strong work ethic, a good attitude, and you're ready to start something solid – we want to hear from you!

πŸ“© Apply now by sending your resume to [email protected]
https://www.seek.com.au/job/87422640?ref=direct-share-hirer-jobs-list

CivilCS completed the Reynolds Road Design and Construction works in 2022 for Richmond Valley Council. The works involve...
25/06/2023

CivilCS completed the Reynolds Road Design and Construction works in 2022 for Richmond Valley Council. The works involved new 6m sewer pump station, 100mm rising main, a new 200/250mm water main, a number of directional drills under Summerland Way, and development of the sewer pump station site.

CivilCS Pty Ltd has started works on a new water main for Lismore Council at the Lismore Waste Centre. The works consist...
25/06/2023

CivilCS Pty Ltd has started works on a new water main for Lismore Council at the Lismore Waste Centre. The works consist of new 110 HDPE and 150 Ductile Mains with new valves and hydrants.
The new main should improve water flow rates around the waste centre.

Finishing off works on a new car park for the Wilson Park School in Lismore.
25/06/2023

Finishing off works on a new car park for the Wilson Park School in Lismore.

Address

Dunoon Road
Tullera, NSW
2480

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm
Friday 7am - 5pm
Saturday 7am - 12pm

Telephone

+61437588886

Alerts

Be the first to know and let us send you an email when Civil CS posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Civil CS:

Shortcuts

Share