17/06/2026
Integrated Engineering. Better Project Outcomes.
Building successful Solar and Battery Energy Storage System (BESS) projects requires far more than simply installing equipment. It demands the right expertise across every stage of design and delivery.
At TOBCO, we believe the strongest projects are delivered through the integration of three core disciplines from day one:
Civil Engineering
Site preparation, earthworks, drainage, access roads, foundations, and cable infrastructure.
Electrical Engineering
High and medium voltage systems, grid integration, balance of plant design, protection systems, controls, and commissioning.
Mechanical Engineering
Equipment installation, structural systems, thermal management, fire protection interfaces, and overall system integration.
By bringing these disciplines together under a coordinated delivery model, solar and BESS projects can be delivered more safely, more efficiently, and with greater confidence in long-term performance.
As Australia’s energy transition accelerates, integrated engineering and ex*****on will remain critical to delivering reliable renewable infrastructure at scale.
For project enquiries or to learn more about TOBCO’s capabilities, contact us at:
📞 (02) 8000 1224
✉️ [email protected]
🌐 www.tobco.com.au