15/10/2026
FEATURE LIGHTING STARTS LONG BEFORE SWITCH-ON.
The feature ceiling at Level 10, 475 Victoria Avenue, Chatswood is taking shape.
Before painting and final installation, the electrical set-out and connections must align with the architectural detail. Our team is preparing and protecting the lighting infrastructure while surrounding works continue.
Precision at rough-in stage is what allows the final feature to look clean, intentional and effortless.
Project enquiries:
Peter Lionis | Managing Director
0410 667 771
[email protected]
inelectricalgroup.com.au