I and N Electrical Group

Call Directions Website

I and N Electrical Group The home of professional electrical services with a legacy of over 15 years in the industry

15/10/2026

FEATURE LIGHTING STARTS LONG BEFORE SWITCH-ON.

The feature ceiling at Level 10, 475 Victoria Avenue, Chatswood is taking shape.

Before painting and final installation, the electrical set-out and connections must align with the architectural detail. Our team is preparing and protecting the lighting infrastructure while surrounding works continue.

Precision at rough-in stage is what allows the final feature to look clean, intentional and effortless.

Project enquiries:
Peter Lionis | Managing Director
0410 667 771
[email protected]
inelectricalgroup.com.au

13/10/2026

THE CEILING HIDES THE WORK. THE RESULT DEPENDS ON IT.

Above-ceiling progress at Level 10, 475 Victoria Avenue, Chatswood.

Electrical rough-in is being coordinated around the structure and other building services, with cable routes and lighting points prepared for the next stages of the fitout.

This is where good planning matters: accurate set-out, practical access and an installation designed to perform long after the ceiling closes.

Project enquiries:
Peter Lionis | Managing Director
0410 667 771
[email protected]
inelectricalgroup.com.au

11/10/2026

BEFORE THE WALLS CLOSE, THE SERVICES MUST BE RIGHT.

Progress at Level 10, 475 Victoria Avenue, Chatswood.

At this stage, the most important work is often the work that will soon disappear. The I&N Electrical Group team is coordinating electrical pathways, cabling and connection points before the walls and ceilings close.

Careful planning now supports a safer installation, cleaner finishes and reliable performance at handover.

Project enquiries:
Peter Lionis | Managing Director
0410 667 771
[email protected]
inelectricalgroup.com.au

08/10/2026

HOT WATER IS THE OUTCOME. RELIABILITY IS THE JOB.

The visible result may be simple, but dependable building services rely on the infrastructure behind them.

This final look at the hot-water replacement works at 101 Miller Street shows the coordinated electrical services, controls and connections supporting the upgraded system.

Careful installation and attention to detail help create an outcome ready to perform every day.

06/10/2026

NEW SYSTEM. ZERO ROOM FOR GUESSWORK.

Major infrastructure work depends on every route, control and connection working together.

At 101 Miller Street, the I&N Electrical Group team delivered the electrical services supporting the hot-water replacement—coordinating new cabling, control equipment and connections within the existing plant environment.

It is detailed work, installed with the final operation in mind.

Built with purpose. Installed with precision.

05/10/2026

THE POWER WENT OFF. THE PLAN TOOK OVER.

A major infrastructure upgrade begins well before new equipment is connected.

At 101 Miller Street, North Sydney, the I&N Electrical Group team carefully coordinated the planned shutdown and electrical isolation required for the hot-water replacement works.

Clear planning, controlled access and close coordination created the safe conditions needed for the installation to proceed.

Because when essential services are involved, control starts with the plan.

01/10/2026

INSTALLED. PROTECTED. READY.

Feature-light installation is progressing at Level 10, 475 Victoria Avenue, Chatswood.

With the fittings now installed, each light has been carefully protected ahead of ceiling painting—helping preserve the finish while allowing the next stage of work to proceed.

It is a simple but important part of delivering quality electrical work: install with care, protect what is complete and coordinate for the trades that follow.

Another step forward for the I&N Electrical Group team.

Planning a commercial fitout or electrical services upgrade?

inelectricalgroup.com.au
0410 667 771

29/09/2026

THE FINISH STARTED HERE.

Before the completed workplace came the electrical rough-in, service coordination and careful planning behind every visible detail.

At Levels 6 and 7, 388 George Street, the I&N Electrical Group team worked through each stage of the installation with the finished result always in mind.

Cable pathways, power and lighting infrastructure may disappear behind the final surfaces—but they are what allow the workplace to operate every day.

From rough-in to result, good electrical work makes the finish possible.

Planning a commercial fitout or electrical services upgrade?

inelectricalgroup.com.au
0410 667 771

25/09/2026

DEMOLITION STARTS WITH ELECTRICAL MAKE-SAFE.

Before any demolition or strip-out begins, the existing electrical services must be identified, isolated and made safe.

At Level 10, 475 Victoria Avenue, Chatswood, the I&N Electrical Group team completed the initial electrical make-safe works—creating a controlled starting point for the construction programme to move forward safely.

Safety is not a final check. It is step one.

inelectricalgroup.com.au
0410 667 771

23/09/2026

THE SPACE IS TAKING SHAPE. SO IS THE POWER BEHIND IT.

As framing, walls and ceiling works progress at Level 10, 475 Victoria Avenue, Chatswood, the electrical installation is developing alongside the new workplace.

Careful coordination at this stage helps ensure every electrical pathway and connection is positioned correctly before the finishes close everything away.

Built around coordination. Installed for long-term performance.

inelectricalgroup.com.au
0410 667 771

Address

PO Box 337 Street Clair
Sydney, NSW
2759

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm
Friday 7am - 5pm
Saturday 7am - 12pm

Telephone

+61410667771

Alerts

Be the first to know and let us send you an email when I and N Electrical Group posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share

Category