Green Civil Services Pty Ltd Green Civil Services is a family-owned Consulting and Civil Construction business that was formed in August 2019.

Green Civil Services is a premier consultancy, design, and construction company serving New South Wales, Victoria, and Queensland.

🚧 Kyogle Off-Stream Storage Facility - Landslip Remediation & Sludge Lagoon Construction Works are progressing on Landsl...
17/08/2026

🚧 Kyogle Off-Stream Storage Facility - Landslip Remediation & Sludge Lagoon Construction

Works are progressing on Landslip Remediation & Sludge Lagoon at the Kyogle Off-Stream Storage Facility.
Here’s a look at the project scope:

Sludge ponds
- Completion of design
- Construct a temporary access road
- Demolish the two existing sludge ponds and construct a replacement sludge pond
- Removal of all water and sludge from the two existing sludge ponds
- Construction of one concrete-lined sludge pond and forebay
- Test excess material and lawful disposal
- Road construction
- Perimeter fence construction
- Landscaping

Slips B and C
- Completion of design
- Construction of two temp roads to access the slips by progressively installing screw piles, concrete block walls, concrete, culvert pipes and rock
- Install sheet piles into the river to assist in dewatering the toe of the bank, pump water from the bunded area, and removal of sheet piles when no longer required
- Removal of vegetation and lawful disposal
- Progressively install geogrid, aggregate, rock, and concrete blocks to retain the land surrounding the slips
- Once the slip remediation works are complete, leave the screw piles, concrete block retaining walls, and concrete slabs within the temporary roads, remove the aggregate surfacing, cover with excess fill, topsoil, and grass seed
- Landscaping

Stay tuned for further project updates!

🚧 Gymea Bay Baths Reserve – Stage 1 Project Update!Works are progressing on the Stage 1 upgrades at Gymea Bay Baths Rese...
17/08/2026

🚧 Gymea Bay Baths Reserve – Stage 1 Project Update!
Works are progressing on the Stage 1 upgrades at Gymea Bay Baths Reserve. Here’s a look at the project scope:

- Demolition of the decommissioned toilet & other Structures
- Construction of new stairs from Ellesmere Road into the reserve
- Installation of accessible stairs between the car park and baths area
- Electrical and lighting design works
- Construction of sandstone retaining walls
- Car park upgrades
- Stormwater Upgrades
- Bush regeneration, landscaping and planting works

These upgrades will provide safer, more accessible connections throughout the reserve while enhancing the surrounding natural environment.

Stay tuned for further project updates!

04/02/2026

Check out our Interview with some of the Locals and Recent visitors of the Boardwalk at Hungry Point Reserve and their thoughts on this amazing project!!!

🚧 We are very pleased to announce the completion of our Hungry Point Cliff Top Walk - Stage 1 project. We are so excited...
21/12/2025

🚧 We are very pleased to announce the completion of our Hungry Point Cliff Top Walk - Stage 1 project. We are so excited for everyone to finally enjoy this amazing Boardwalk.

The project includes the construction of a raised, steel suspended boardwalk with both concrete and Sandstone stair access, along with seating areas, viewing platforms, and landscaping enhancements throughout the project.

Thank you to Sutherland Shire Council for allowing us to make this beautiful project come to life.

09/12/2025

Can't Wait for everyone to see the completion of our Boardwalk at Hungry Point Reserve. Here's a little sneak peek before the opening in a couple of weeks.

21/11/2025

🚧 Hungry Point Cliff Top Walk - Stage 1 Progress Update! We are so close to being complete!! Check out this Progress Video.

The project includes the construction of a raised, steel suspended boardwalk with both concrete and steel stair access from Nicholson Parade, along with seating areas, viewing platforms, and landscaping enhancements.

Stay tuned for the project completion in the coming weeks.

🚧 Hungry Point Cliff Top Walk - Stage 1 Progress Update!We're making great strides since the last update. Here's a quick...
04/11/2025

🚧 Hungry Point Cliff Top Walk - Stage 1 Progress Update!

We're making great strides since the last update. Here's a quick look at where we're at:

- Construction on WW6 and WW7 are underway and nearly completed
- Rock bolting for embankment stabilisation for the cliff face on WW6 and WW7 has commenced
- WW5 entire structure and handrail complete
- All landscaping and planting complete
- Grass Areas have been re-turfed

Stay tuned for the project completion in the coming weeks.

28/10/2025
🚧 We’re thrilled to announce the Completion of the Design & Construct project of the Kyogle Rd Landslip Remediation, Lil...
28/10/2025

🚧 We’re thrilled to announce the Completion of the Design & Construct project of the Kyogle Rd Landslip Remediation, Lillian Rock.

Project is complete with the following full scope
- Construction of an access track
- Preparing the slope by removing eroded material
- Installing a 4m High Gabion Wall Structure
- Subsoil drainage
- Scour protection
- Pavement removal and reinstating the road verge and flexible pavement.