Structial Building Pty Ltd

Structial Building Pty Ltd Remedial Builder
Mining infrastructure and mitigation
Fire upgrades
Infrastructure repair and rehabilitation

Community Management Guidelines

- We don’t allow defamatory, indecent, offensive, profane, discriminatory, misleading, unlawful or threatening comments and will not be tolerated.
- Personal attacks, name-calling, trolling and abuse will not be tolerated.
- Spamming, posting promotional material or posting links to third party websites is not permitted.
- Coordinated group attacks will not be tole

rated.
- Respect that other people in the community have had different life experiences and may have a different perspective to yours. We welcome different viewpoints.
- We will hide any comments which are deemed to be in breach of our Community Management Guidelines, which outline that ‘we reserve the right to hide or remove any comments which are deemed alarming, inflammatory, derogatory, or include prejudice or profanity'
- Our community is a public place. Don’t post personal information that you would not be comfortable sharing with a stranger. We recommend that you don’t post any information that may identify you or anyone else, such as your address, email address or phone number. We reserve the right to hide or remove any comments which are deemed alarming, inflammatory, derogatory, or include prejudice or profanity.

Remedial works completed at Clinton Apartments, 22 New Street Bondi 🏗️The Structial team carried out concrete repairs, w...
23/06/2026

Remedial works completed at Clinton Apartments, 22 New Street Bondi 🏗️

The Structial team carried out concrete repairs, waterproofing, façade upgrades, and balcony remediation works to restore and protect this coastal apartment building.

A durable outcome designed to improve safety, performance, and long-term asset life.

Mining infrastructure built for demanding environments ⛏️We delivered a new heavy vehicle water cart fill point designed...
19/06/2026

Mining infrastructure built for demanding environments ⛏️

We delivered a new heavy vehicle water cart fill point designed to support ongoing mining operations at Barry’s Fill Point in the Hunter Valley.

• Gabion basket construction
• Stabilised fill and reinforcement
• Reinforced concrete slab installation
• Placement of large water retaining tanks

A durable infrastructure solution designed to perform in tough site conditions and support long-term operational requirements.

11/06/2026

Waterproofing in progress at Bellevue Hill 💧

Our skilled team of waterproofers installed the ARDEX Butynol membrane system beneath this balcony decking, delivering a durable waterproofing solution designed for long-term protection and performance.

Quality detailing and precise installation are key to ensuring reliable results in every remedial project.

Fire safety systems that protect people and property 🔥We deliver fire safety upgrade solutions designed to improve compl...
03/06/2026

Fire safety systems that protect people and property 🔥

We deliver fire safety upgrade solutions designed to improve compliance, performance, and occupant safety across residential, commercial, and industrial buildings.

Structial's fire protection services include:

✅ Fire separation works to walls, ceilings and roof spaces
✅ Fire sealing using rated collars, pillows and sealants
✅ Installation of fire-rated doors and windows
✅ Sprinklers, hydrants, hose reels and extinguishers
✅ Smoke detection, emergency lighting and signage
✅ Fire safety upgrades in live environments

With over 30 years of remedial construction experience, our team delivers efficient fire protection solutions with minimal disruption to occupants.

Rooftop remedial waterproofing at Museum Towers 🏙️Our team completed the re-waterproofing of the upper roof level on thi...
24/05/2026

Rooftop remedial waterproofing at Museum Towers 🏙️

Our team completed the re-waterproofing of the upper roof level on this 35-storey apartment building, replacing an ageing bituminous membrane with the Sikafloor N – Elastic polyurethane system.

The works included detailed roof slab preparation, epoxy priming, and multi-coat membrane application to ensure long-term protection. The project was delivered in collaboration with Majcon Engineers & Project Managers and Sky Management.

A strong result and another successful remedial project delivered.

Expert building repairs that restore and protect.At Structial, we specialise in remedial building repair and refurbishme...
20/05/2026

Expert building repairs that restore and protect.

At Structial, we specialise in remedial building repair and refurbishment, delivering practical solutions for structures affected by age, environmental exposure, or construction issues.

Our building repair capabilities include:

✅ Internal & external waterproofing
✅ Fire safety upgrades
✅ Concrete repair & protection
✅ Crack repair & stabilisation
✅ Façade repair & over-cladding
✅ Structural strengthening

With experienced teams and proven systems, we deliver efficient solutions for complex remediation projects while minimising disruption to occupants.

The Structial team demolished the original garage slab of this apartment block in Bondi which was severely deteriorated ...
12/05/2026

The Structial team demolished the original garage slab of this apartment block in Bondi which was severely deteriorated and unsafe for tenants. We constructed a new concrete slab with a crash barrier and drainage.

Our Project Remediate project at 6 Lachlan St, Waterloo is now complete. All flammable cladding panels removed and repla...
05/05/2026

Our Project Remediate project at 6 Lachlan St, Waterloo is now complete. All flammable cladding panels removed and replaced with non-flammable alternative products. A job well done. Completed incident free, in a busy pedestrian and retail environment.

Structural repairs that restore strength and extend service life.At Structial, our team delivers repair solutions design...
26/04/2026

Structural repairs that restore strength and extend service life.

At Structial, our team delivers repair solutions designed to restore integrity, improve durability, and protect assets for the long term.

Our capabilities include:

• Crack injection and concrete repair
• Structural strengthening and reinforcement
• Spalling concrete remediation
• Protective coatings and corrosion mitigation
• Structural remediation for ageing infrastructure

From targeted repairs to large-scale remediation works, Structial provides practical solutions that keep structures safe, compliant, and built to last.

Our Hunter Valley team delivered improvements to the bund wall around a fuel farm at Yancoal’s Mount Thorley Warkworth m...
18/04/2026

Our Hunter Valley team delivered improvements to the bund wall around a fuel farm at Yancoal’s Mount Thorley Warkworth mine site.

Designed to meet NSW Environmental Protection Authority requirements, bunding structures must provide an impermeable, leak-proof containment system with a net capacity of 120% of the largest tank, or 133% for flammable liquids.

A durable solution supporting safe operations and environmental protection on site.

Address

305 Princes Highway
St Peters, NSW
2044

Opening Hours

Monday 7:30am - 4pm
Tuesday 7:30am - 4pm

Alerts

Be the first to know and let us send you an email when Structial Building Pty Ltd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share