Our Client decided it was time to renovate their home, and asked us to help!
Swipe π for some Project Photos
To complete this Project, we:
π₯ Pulled Up the Existing Bamboo and Tiles
π₯ Diamond Grind the Concrete Subfloor to Remove the Bamboo and Tile Adhesive + Other Contaminants that may have impeded the bonding of the Levelling Compound to the Concrete Subfloor
π₯ Supplied and Applied Cemimax DL55 to the Concrete Subfloor
π₯ Rotary Sanded the Cemimax DL55 once dry, checked, and topped up as required
π₯ Rotary Sanded the Topped Up Cemimax DL55
π₯ Supplied and Install an 18mm MDF Stringer to the Staircase
π₯ Supplied and Installed Plywood to Pack Out the MDF Staircase Riser to meet the MDF Bullnose; creating a squared step ready for Installation
π₯ Supplied and Installed Custom Made Rustic Blackbutt 7mm Hybrid Plank Nosings to the Steps, and Rustic Blackbutt 7mm Hybrid Plank to the Risers
π₯ Supplied and Installed Impact Resistant 200um Builders Plastic; laid Floating over the Concrete Subfloor
π₯ Supplied and Installed Rustic Blackbutt 7mm Hybrid Plank; laid Floating over the Impact Resistant 200um Builders Plastic
π₯ Supplied and Installed MDF Rustic Blackbutt to the First Step Riser and Kitchen Cabinetry
π₯ Supplied and Installed Rustic Blackbutt Universal Top Covers to the Tiles, and Rustic Blackbutt Multi-Angles to the Front Door Frame, Shoppers Entry Door Frame, Sliding Door Frames, and the Ground Level Window Frames
The Project is now ready for the Client to Install their New Skirting and undertake Painting Works π
Renovating Your Home? π·ββοΈπ·ββοΈπ‘
Chat to Us NOW! π
π‘ Unit 6 / 2 Smeaton Way, Rockingham
βοΈ 9528 1524
π₯ [email protected]
Dont forget to follow us on Facebook and Instagram: coastalflooringwa for updates on our current Projects π²