By just listening, Logan "The Turf Whisperer"  can tell whether turf will strike or not—and this project earns his appro...
01/09/2026

By just listening, Logan "The Turf Whisperer" can tell whether turf will strike or not—and this project earns his approval! ✅

We recently completed the kerb reconstruction at Lonsdale Promenade.

🪏Scope of Work:
• Old kerb excavation
• Base reconstruction
• New kerb install
• Asphalt tie-in
• Turf reinstatement

Fantastic effort to all those involved team to deliver a clean, high-quality finish from start to finish. 👷‍♂️

Thank you Meander Valley Council for running this project 🔥

JBC

👏🏼👏🏼
26/08/2026

👏🏼👏🏼

Over the last few days we haven been carefully exposing and removing sections of an old watermain.

A bit of patience and a gentle touch needed to get around the existing pipe and avoid any damage.

Always satisfying seeing a job like this come together. 🚜
Crossroads Civil Contracting Pty Ltd

✨Stage 1 of the Country Club Ave road rehabilitation works is officially complete! 🛣️The team did an outstanding job on ...
25/08/2026

✨Stage 1 of the Country Club Ave road rehabilitation works is officially complete! 🛣️

The team did an outstanding job on the kerbing and asphalt, delivering a top-quality finish for the community. Massive shoutout to the crew for their hard work and attention to detail on this one— the linemarking is sharp and the revegetaiton is coming in thick🔥!

Shout out to some of the legends who did a great job Tasmania 🙌

Final cheers to Meander Valley Council for faciliting this epic project 👏

⚡ In and out within 24 hours ⚡Massive shout out to the boys for an impressive turnaround!Within 24 hours, the crew succe...
18/08/2026

⚡ In and out within 24 hours ⚡

Massive shout out to the boys for an impressive turnaround!

Within 24 hours, the crew successfully:

✅ Removed the damaged kerbing
✅Prepared and poured fresh kerb
✅Backfilled and cleaned up the site

Quality work delivered ahead of time! 🏗️💪

If you're out in the Gorge, keep an eye out for one of the Crossroads crew! 👀👇🛣️The boys are doing some essential paveme...
17/08/2026

If you're out in the Gorge, keep an eye out for one of the Crossroads crew! 👀👇🛣️

The boys are doing some essential pavement repairs that include:

🔹 Digging out failed sections (200mm deep)
🔹 Compacting a strong 3% cement gravel mix
🔹 Laying down a fresh asphalt finish

If you see them give them a wave 👋🏼

📣Kerb Replacement Works – Douglas Street between Campbell Street and Wentworth Street 📅Start Date: 6th August 2026🕘Durat...
04/08/2026

📣Kerb Replacement Works – Douglas Street between Campbell Street and Wentworth Street

📅Start Date: 6th August 2026

🕘Duration: 4 business days (weather permitting)

🛣️As part of City of Launceston's road reseal program, Crossroads Civil Contracting will be replacing sections of damaged kerb in Douglas Street prior to the road being resealed.

⚠️ Some on street parking will be affected but we will place ‘No Parking’ bollards in the affected areas. No driveways will be affected so property access will remain open, however if you have any concerns please talk to one of our friendly workers or call our Operations Supervisor, Kyle, on 0466 966 521 .

Getting stuck into the Lonsdale Promenade Kerb Renewal! 💪🏼Pits and pipes are going in under the road to keep the water f...
03/08/2026

Getting stuck into the Lonsdale Promenade Kerb Renewal! 💪🏼

Pits and pipes are going in under the road to keep the water flowing right where it needs to go. 💧

Kudos to the crew putting in the work! 🏗️

Jorden Beams

🚜 The Profiler in Action 🚧​Ever wonder how we prepare a road for a smooth, long-lasting surface? It all starts with the ...
31/07/2026

🚜 The Profiler in Action 🚧

​Ever wonder how we prepare a road for a smooth, long-lasting surface? It all starts with the profiler!

​Before new asphalt can be laid, the profiler precisely mills the road to the desired depth and deposits the material in trucks. This one here is milling 220mm deep. 📏

This crucial first step ensures the new road can be built on a uniform surface. Minimizing excavation times and constructing a safe road for years to come 🙌

Shoutout to the Subdivision Crew for a seamless job! 🙌The team recently completed ​major water main works —cutting a 450...
22/07/2026

Shoutout to the Subdivision Crew for a seamless job! 🙌

The team recently completed ​major water main works —cutting a 450mm tee into a 450mm ductile iron main line to tie in the new stage.

Mains are back on, up to full pressure, with zero leaks! 🛠️💧

This is the invisible infrastructure that no one sees but keeps everything moving 👍🏼

GETTIN’ IT DONE! 🏗️💯Massive shoutout to the teams working on a Saturday to get the job done.While we don’t usually work ...
18/07/2026

GETTIN’ IT DONE! 🏗️💯

Massive shoutout to the teams working on a Saturday to get the job done.

While we don’t usually work on Saturdays, we had 3 sites running today, making the most of this good weather while it lasts! ☀️🔥

✨ Panorama Rd: 100m Concrete pour of 2.5m wide Shared path.

🌱 Country Club Ave: Hydroseeding reinstated areas behind the kerb

💧 Country Club Subdivision: Laying of 450mm ductile iron, cement-lined water main.

Cheers, team! Thanks for ripping in.

Address

73-79 Lilydale Road
Rocherlea, TAS
7248

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

+61363332340

Website

Alerts

Be the first to know and let us send you an email when Crossroads Civil Contracting Pty Ltd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share