25/09/2026
It’s fair to say you can’t change a site like this in 4 days without a great team behind you.
*Greens bay slab prepped on grade with thickenings dug - Check
*Wash bays prepped to grades, falls and footings dug - Check
*Strip main site, remove all waste, remediate at lower levels, build up pads and provide a 200mm limestone base ready for construction.
Boom 👊