24/09/2026
Built in Orbost. Delivered to Mallacoota.
A big milestone for this Built QA project, with this three-module, four-bedroom home arriving on site in Mallacoota.
Projects in remote locations require a high level of planning and logistics. By constructing the home in our controlled manufacturing facility, we’re able to complete a significant portion of the build before it ever reaches site — helping to reduce on-site construction time, minimise weather-related delays and improve overall project efficiency.
The delivery and installation of three large modules takes careful coordination between our team, transport operators, crane crews and contractors, and it’s great to see everything coming together on site.
There’s still more to come, including the external decks and finishing works, but this one is already taking shape in an incredible location overlooking the water.
Manufactured off-site. Delivered with precision. Built for its location.