02/04/2026
New Lambton project well and truly underway 🔨
We’ve stripped back the old cladding and started fresh — new insulation installed, breather wrap in place, and an aluminium ventilated cavity system locked in.
This cavity system is key 👇
✔️ Allows the walls to breathe
✔️ Prevents moisture transfer into the insulation
✔️ Improves overall durability of the build
By installing battens, we’re also able to straighten and true up the existing walls — setting everything up perfectly for the new cladding install.
Stay tuned as this one comes together 👌