13/10/2026
Up to 70mm of slab lift in two days, with no excavation.
An industrial building of precast tilt panel construction in South Kempsey, NSW, constructed on a concrete slab-on-ground and concrete bored piers, had subsided by up to 76mm along its western elevation.
Resinject used RSJ170 engineered resin to fill voids beneath the slab, densify the founding soils and lift the slab back towards level, while the facility kept operating.
Have a subsiding slab or voids beneath concrete?
Talk to Resinject:
[email protected] | 1300 091 441