Integrum Power Group

Integrum Power Group Creating simple end to end solutions, connecting people and power!

Authorised Level 2 ASP
Cat 1, 2, 3, 4

- Residential & Commerical
- Underground/Overhead Services
- Metering Services
- Ausgrid Defects
- 24hr Emergency Services

31/07/2025

๐Ÿ“ข Heads up Ausgrid community!

A storm system is still developing off the coast this weekend, bringing more strong winds and heavy rain across our network.

The worst of the weather is likely on Saturday August 2, with wind gusts possibly reaching up to 100km/h and heavy widespread rainfall. While the forecast may change, weโ€™re keeping a close eye on it and will share updates as they come.

In the meantime:

โœ… Secure outdoor items like furniture and trampolines to prevent damage.
๐Ÿ”Œ Turn off and unplug appliances to protect them from power surges.
๐Ÿ“ฑ Charge your devices and save Ausgridโ€™s outage map: ausgrid.com.au/outages.
๐Ÿ’ก Avoid fallen powerlines, always assume theyโ€™re live and keep at least 8m away.

Stay safe and look out for each other ๐Ÿ’™๐Ÿ’š

Road opening , conduits in and temp Resto for a 4 town house development in Wickam
06/05/2025

Road opening , conduits in and temp Resto for a 4 town house development in Wickam

400A Distribution Switchboard change over and a little bit of demolition ๐Ÿ‘ท๐Ÿผ๐Ÿ”จโšก๏ธ๐Ÿ’ก           โšก๏ธ
01/02/2025

400A Distribution Switchboard change over and a little bit of demolition ๐Ÿ‘ท๐Ÿผ๐Ÿ”จโšก๏ธ๐Ÿ’ก

โšก๏ธ

Always leave the site as clean or cleaner then you found it ๐Ÿ‘Œ๐Ÿผ. Flick right to see before and after.Ticky little hand di...
14/01/2025

Always leave the site as clean or cleaner then you found it ๐Ÿ‘Œ๐Ÿผ. Flick right to see before and after.

Ticky little hand dig today in a new garden to install 3 phase underground mains and a new 5 inch private pole

โšก๏ธ

13/06/2024

Paperlead transition joint with the Energy Infrastructure Services crew

Play by play of our recent 200A upgrade site prep.
02/02/2024

Play by play of our recent 200A upgrade site prep.

Pole change over day was a success. The boys killed this oneThe existing private network pole was passed her due by date...
13/01/2024

Pole change over day was a success. The boys killed this one

The existing private network pole was passed her due by date and in dire need of replacement. Good for another 50 years.

Address

Kimbarra Close
Newcastle, NSW
2289

Alerts

Be the first to know and let us send you an email when Integrum Power Group posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Integrum Power Group:

Share

Category