Stephen and Sophieβs build continued its progress this week, with all the blockwork completed externally, and the rest of the gyprock hung inside with Zayne starting the flushing process which should lead to having at all sanded and corniced by the end of next week!ππ
The boys from CKK were also on site starting the cupboard installation in the wet areas, so the tiling can continue next week, and will be back to site in a week or so, once Zayneβs completed the flushing of the remaining rooms etc, to go ahead with the BIRβs and kitchen etc fit out!ππ
The progressive improvements and updates to the rooms at Motel Mount Gambier continued this week with Choices flooring coming in for us, and removing 6 rooms worth of old carpet and laying the new carpet tiles!ππ
With a bit of new paint splashed around in the coming weeks should give the rooms a bit of a lift!ππ
The speccy and Louieβs builds got another step closer to getting the slabs down this week, with Ty, Tom and Elliot smashing out the underfloor plumbing and drains to both houses, and after testing and inspections we had Paul on his trakka come in and backfill the drains ready for the guys to start levelling the pads ready to lay mesh and plastic next week!ππ
We also had Michael and Dick on site to lay the electrical mains to both jobs as well as Jay to install the Telstra conduits for the NBN connections at a later date!ππ
Leggo and Tarkyn were able to get back to Ben and Sushilaβs house to continue the external brickwork, after Sam from K and B Mitre 10 rang with the good news that they had finally had some off white cement land in store!ππ
Inside, Langas and Tex have fitted the architraves to the windows, installed door jams and starting hanging external and internal doors, to really be getting through the second fixing nicely!ππ
Matt was also on site getting ahead of the game by starting all the floor preparations for the waterproofing and tiling, and we also had Dollar Curtains come and measure up for the blinds, so we can get the order in prior to the end of October order cutoff time, for the remainder of the year!π¬π
We also had a call from Neal to give a him a hand to help pour and finish a driveway for a job which was the last piece of the puzzle for him to knock over and finish!ππ