A little different from our usual bathroom renovations this week, we completed a rectification of an existing shower and bathroom.
Once demolition commenced, we uncovered significant water ingress and damage within the existing floor and wall construction, requiring the scope to extend well beyond what was originally visible.
We stripped the affected areas back, repaired the floor and shower framing, installed new wet-area substrates and waterproofing, retiled the shower and floor, and completed the bathroom ready to go back into service.
Plenty of work hidden behind what looks like a relatively simple finished result - but that's often where the most important work is.