30/06/2026
We have a new job underway in Ballan. looking forward to this one. We have some old red recycled paving to do under the pergola with paths to connect to existing path and to the clothesline as well. This will be a picture frame with 45deg herringbone pattern. We have brick edging for the garden beds. soil preparation for lawn. irrigation system as well. topping it off with a new lawn.