13/04/2026
Full factory demo in Abbotsford.
First step was installing scaffold along the frontage to protect the public and neighbouring properties.
We then carried out asbestos removal across the roof and internal areas.
From there, it was a controlled demolition — managing access/egress, trucks, and material in a tight one-way street without causing disruption around us.
These jobs aren’t about smashing things down as fast as possible. It’s about control, safety, and delivering the project on time.
Great effort by the crew on this one.
If you’ve got something similar coming up, get in touch — happy to have a chat.