27/08/2026
These photos capture the planning and scoping phase of alternator replacement at the Racecourse Mill Co-gen Plant 📸
The works included assessing the disconnection of old field components and cable tray required for the skate system used to remove the faulty alternator armature and install the replacement.
As with every project, careful planning and detailed preparation are essential to achieving a safe and successful outcome.