Richmond Vale Rail Trail

Richmond Vale Rail Trail The Richmond Vale Rail Trail (RVRT): Connecting Hunter Region communities, tourism and conservation areas.

WE NEED YOUR HELP & SUPPORT

The proposal:

The RVRT will comprise a 32km (40km with connections) continuous off-road shared pathway, running from Shortland (near the Hunter Wetlands Centre) to Kurri Kurri (Log of Knowledge Park) and connecting four LGAs (Newcastle, Lake Macquarie, Cessnock and Maitland). The trail runs primarily along the former Richmond Vale railway alignment [a private coal li

ne that closed in 1987], as well as utilising Hunter Water Corporation pipeline corridors. Currently, five local community hubs are planned – at Shortland, Tarro, Fletcher, Minmi and Kurri Kurri – and, to date, 27.5 km of the RVRT has received initial planning approval. The RVRT will support a broad range of user groups and deliver a cost-effective array of life-changing benefits, including: community access and connection; health and lifestyle benefits; environmental and heritage appreciation; economic and tourism; as well as cycling-specific safety and commuting benefits. Importantly, the RVRT will also uniquely link metropolitan and rural communities and attractions, and facilitate access to multiple previously inaccessible high conservation value areas (e.g., Hunter Wetlands National Park, Pambalong Nature Reserve, Stockrington and Werakata State Conservation Areas). The RVRT will also be an essential element within the proposed 100+ km broader ‘Shiraz to Shore’ Hunter Cycle Trail [an initiative of the Hunter Joint Organisation of Councils]. Background and Approvals:

• The RVRT proposal started in around 1999/2000 and involved Cessnock City Council (CCC), Coal & Allied and Newcastle City Council.

• Preliminary studies were undertaken covering aspects of the RVRT:
– CCC facilitated a tourism study using UTS students to examine and report on the feasibility of the RVRT.
– ARUP Pty Ltd was commissioned to complete a report on Cycle Tourism in the Hunter Region, which was delivered in September 2005.
– A feasibility study was undertaken by Mike Halliburton Associates (2014), which recommended the RVRT based on the ‘constructability, value, community benefit and tourism potential of the trail’.

• In 2016 Cessnock, Newcastle and Lake Macquarie Councils began work on the current RVRT proposal, ‘with funding contributions from the National Parks and Wildlife Service and the Donaldson Conservation Trust, and project management through City of Newcastle’.

• In December 2018, a Lord Mayoral Minute (ITEM-24 LMM 10/12/2018 - Richmond Vale Rail Trail Working Party): acknowledged ‘the significant body of work already completed by the City of Newcastle, City of Cessnock and City of Lake Macquarie towards the realisation of the Richmond Vale Rail Trail’; noted that the Greater Newcastle Metropolitan Plan ‘encourages the completion of the Richmond Vale Rail Trail as an opportunity to promote healthy lifestyles, extend recreation opportunities and contribute to expanding the Blue and Green Networks’; and identified the need for ‘a Richmond Vale Rail Trail Working Party comprising Councillors, Council Officers and community members’. (Similar Mayoral Minutes were supported by Lake Macquarie and Cessnock Councils).

• The Newcastle LGA section of the trail (‘Shortland to Tarro and Pambalong’) impacts on coastal wetlands. Consequently, an Environmental Impact Statement (EIS) was required, which was prepared largely by GHD (Newcastle) and formed part of the Development Application (DA2020/00641) exhibited by Newcastle City Council in August-Sept. 2020. An amended proposal was subsequently exhibited in August-Sept. 2021.

• A short (100 metre) coastal wetlands section of the trail (adjacent to Pambalong Nature Reserve) was approved by Cessnock City Council on 26th April 2021 (DA 8/2020/20463/1), subject to 32 Conditions of Consent.

• The Hunter & Central Coast Regional Planning Panel (PPSHCC-55) granted planning approval for the initial (13km) Newcastle LGA section of the RVRT on 6th December 2021 (DA2020/00641), subject to 100 Conditions of Consent. The approved components comprised 4 ‘legs’: 1) Shortland to Hexham Junction (split, 3 km); 2) Hexham Junction to Minmi (7.50 km); 3) Minmi Junction to Pambalong (2.15 km); and 4) Minmi Junction to Fletcher (700 m).

• The trail section crossing Cessnock and Lake Macquarie LGAs (‘Stockrington to Kurri Kurri’) required Reviews of Environmental Factors (REFs) by those Councils, which was publicly exhibited in May 2022.

• The REF for the 14.4 km RVRT Western Section within Cessnock LGA was approved by Cessnock City Council on 17th May 2023, subject to 44 Conditions of Approval.

• Lake Macquarie City Council still need to separately approve their 2.7 km section of the current RVRT Western Section REF (which borders Cessnock LGA on both sides).

• We also strongly believe that the RVRT should be prioritised in any Hunter Cycle Trail construction staging plans, given its strategic relevance, long planning history, and its ability to add directly to existing Newcastle and Lake Macquarie shared pathways (effectively doubling the length of potential off-road rides or walks). Contacts – Sam Reich (Secretary/Treasurer) 0418 402 644 – Billy Metcalfe (President) 0417 453 152 - Terry Lewin (Vice-President) 0404 439 616

Hunter Wetlands Centre – Spring Festival Open Day – September 27th 2026, 10am – 2pm:This year’s Spring Festival Open Day...
02/09/2026

Hunter Wetlands Centre – Spring Festival Open Day – September 27th 2026, 10am – 2pm:

This year’s Spring Festival Open Day at the magnificent Hunter Wetlands Centre is on the last Sunday in September (27/9/2026) and everyone is invited to attend.

As noted in their promotional material: “We're flinging open our doors for another fabulous family-friendly and FREE Open Day showing off our beautiful wetlands grounds and the conservation work we do here! We'll have plenty of things to do and see for visitors of all ages” (see Pic01).

The RVRT Supporters’ Group has a Marquee (Stall) at this year’s Spring Festival; so, please come and say ‘Hello’ to our wonderful volunteers.

Apart from other promotional material (see Pic02), this will be our first opportunity to distribute copies of our new DL sized Postcard. As outlined in a recent Post (25/8/2026), this promotional Postcard showcases the three distinct zones within the proposed Composite 120km Shiraz to Shore and Richmond Vale Rail Trail (S2S/RVRT) Shared Pathway in the Hunter Valley Region of NSW, Australia; Link to previous Post: https://www.facebook.com/richmondrailtrail/posts/pfbid023TN8cq8TSCheorXUiYepGHv7XRDXzHJoQChiMVGjVh4TiBQ3RVgm2k3vyDtujKFKl

Alternatively, if you don’t want to take home a Postcard, you can use your phone to scan one of our related QR Codes (see Pic03) to access more information about the Composite SS2/RVRT, including links to News Items, our July 2026 Newsletter, a YouTube promo, and our Web and pages.

Thanks to all of our RVRT and S2S supporters.

S2S/RVRT Funding Considerations - Revisited: August 2026[Link to download a copy of this Post: (8-page PDF): https://www...
27/08/2026

S2S/RVRT Funding Considerations - Revisited: August 2026

[Link to download a copy of this Post: (8-page PDF):https://www.richmondvalerailtrail.org.au/uploads/1/2/0/4/120411157/facebook_post_-_s2s-rvrt_funding_considerations_-_revisited_-_august_2026.pdf ]

In a Facebook Post from earlier this year [April 27th 2026: It’s Time to Start Constructing the Richmond Vale Rail Trail (RVRT)] we noted: “It is also becoming increasingly obvious that local Councils find it very difficult to accumulate, attract or allocate funding for major community-enhancing cross-regional recreational, active transport and/or tourism-oriented projects like the RVRT or the broader Composite S2S/RVRT Shared Pathway. Essentially, we need the State Government to make major funding contributions, with proportionate assistance from Federal sources”.

Similarly, in our July 2026 Newsletter (https://www.richmondvalerailtrail.org.au/news/july-2026-newsletter-extracted-topics) we said: “Shorter, localised trail segments that connect established facilities like schools, parks and town centres are likely to be suitable candidates for existing programs (e.g., Get NSW Active), which typically fund short-term (deliverable) projects costing up to $5m”. By comparison, the “… long, non-urban segments of the proposed Composite S2S/RVRT” … “will require targeted funding to help move them forward” – which includes the majority of the outstanding 34km 'Rail Trail & Wetlands Zone' (the middle portion of the S2S/RVRT - see Pic01).

The Federal Government’s expanded Active Transport Fund will make a major contribution in this regard, particularly for shorter, self-contained projects; although smaller, regional Councils may have difficulty meeting the co-contribution requirements.

S2S/RVRT Cost Estimates:

During the last decade, several Planning Reports have provided cost estimates for parts of the RVRT (e.g., Socio-economic Impact Assessments; Environmental Impact Statements; DA and REF Reports; and the 2023-24 S2S Concept Plan and associated documents); however, there is no single up-to-date estimate that can be referenced. We have reviewed all of these documents and applied an Inflation Component (at a cumulative rate of 3% per year) based on the year in which the original estimate was provided. On this basis, a current ballpark estimate for full construction of the RVRT would be around $52m to $58m. The full Composite 120km S2S/RVRT would be expected to cost around $110m, or roughly double the cost of the RVRT on its own.

It is also important to acknowledge that none of the 34km RVRT trail exists at present; on the other hand, the non-RVRT components of the Composite S2S/RVRT comprise approx. 86km, of which approx. 47k already exists [e.g., the Hermitage Road Cycleway, Nulkaba to Cessnock Shared Pathway, Tramway Track and Glendale to Speers Point Shared Pathway, and a mix of pathways between Wallsend and Newcastle City/Beach]. It should also be noted that the remaining funds required for the urban S2S/RVRT components are likely to progressively drop (slightly) over time as local Councils secure grants for small sub-sections or make use of other contributions.

Moreover, as we have noted on several occasions - individual Councils are ultimately responsible for the S2S/RVRT shared pathways within their LGAs, including: route choices; staging, funding and construction strategies; timelines, promotion and maintenance – and, in the latter regard, having sufficient funds to construct a quality trail, as well as an integrated, cross-regional approach, should help to reduce ongoing maintenance costs and optimise the trail’s benefits.

Prioritising S2S/RVRT Sub-sections:

Our Conference-style Presentation from earlier this year (March 2026) included some illustrative approaches to funding the S2S/RVRT (https://www.richmondvalerailtrail.org.au/news/updated-presentation-about-composite-s2srvrt-shared-pathway-hunter-valley-nsw-march-2026). Pic02 provides an updated image, with adjusted cost estimates; in this instance, we have used an anticipated base cost per km of $1.5m (for Sub-sections A, B and D) and $2.0m per km for the more complex Sub-sections (C and D), which require either additional structures (e.g., bridges or retaining walls) or will have higher pavement costs.

The four potential self-contained S2S/RVRT sub-sections (A, B, D and E) in Pic02 range from 3km to 6km and could be prioritised for finalised design and construction funding, two each within Cessnock and Newcastle LGAs. These were selected because they are sufficiently small and self-contained to be suitable candidates for standalone grant applications. They were also chosen on pragmatic (and achievability) grounds and because they highlight the diversity of S2S/RVRT linkages and benefits.

Construction of Sub-section A could be tied in with celebrations for the 2028 Bicentennial of Commercial Wine Growing, while construction of Sub-section E will certainly contribute to improved active transport links between Beresfield/Tarro and Newcastle, as well as links to the new M1 Extension. Sub-sections B and D are important community linkage and transition points.

Our RVRT Supporters’ Group members and affiliates have a very strong preference for the initiation of construction within Sub-section C – that is, the middle portion of the RVRT (see Pic02).

Again, as noted in our recent Newsletter:
“The other critical non-urban segment is the historic Premier Sugarloaf Range RVRT section between Stockrington and Wallis Creek in Buchanan (within Cessnock and Lake Macquarie LGAs), which is effectively the ‘jewel in the crown’ for the Composite S2S/RVRT – given its uniqueness, overall attractiveness and tourist-drawing potential (e.g., three brick-lined 1904 railway tunnels; embankments and cuttings; access to several conservation areas; and heritage and educational value)”.

An initial goal (for the non-urban trail segments) would be to find some targeted funding for Sub-section C, or a commitment to design, construct and open the 5km sub-segment between Dog Hole Road and the Tunnel Fire Trail crossing (West of Tunnel #1) [approx. cost $10m] – which is showcased in Pic03, Pic04 and Pic05.

This 5km sub-segment would be: accessible from either end (via public roads – Dog Hole Road and George Booth Drive); relatively straightforward to construct; introduce the public to the beauties of the Stockrington State Conservation Area; and provide an opportunity for a host of agencies to co-operatively work together [including the participating Councils (Cessnock and Lake Macquarie), NSW National Parks and Wildlife Service (NPWS), all tiers of Government, and local businesses and groups]; as well as featuring former railway embankments, cuttings and Tunnel #1, views to the Hunter Expressway, and access to nearby natural features such as Burrenjim Dam and Blue Gum Creek – essentially, an encapsulated version of the Sugarloaf Range segment of the RVRT.

Again, as noted in our July 2026 Newsletter:
“We need a concerted collective effort to secure targeted funding for the ‘Rail Trail & Wetlands Zone’ to both preserve and protect these historic corridors and ensure that the 120km Composite S2S/RVRT becomes a reality”.

Thanks to all of our RVRT and S2S supporters.

Constructive Comments and Feedback Welcome.

Cessnock City Council
Lake Macquarie City Council
City of Newcastle
Hunter Joint Organisation
Dan Repacholi MP
Meryl Swanson MP
Sharon Claydon MP
Pat Conroy MP
Clayton Barr MP, Member for Cessnock
Sonia Hornery MP
Tim Crakanthorp MP
Yasmin Catley MP
Newcastle Cycleways Movement

Richmond Vale Rail Trail (RVRT) Supporters’ Group – Postcard-based Promotion:  August 2026In preparation for future comm...
25/08/2026

Richmond Vale Rail Trail (RVRT) Supporters’ Group – Postcard-based Promotion: August 2026

In preparation for future community events, we have produced a DL sized Postcard which showcases the three distinct zones within the proposed Composite 120km Shiraz to Shore and Richmond Vale Rail Trail (S2S/RVRT) Shared Pathway in the Hunter Valley Region of NSW, Australia; see illustration in Pic01.

Ongoing goals: to increase awareness about the Composite S2S/RVRT Shared Pathway proposal and its benefits; and to help progressively move this proposal forward.

A simplified Stylised Map is shown on the Front of the Postcard (see Pic02), while the Back presents an overview of the trail and the key themes and locations within each zone (see Pic03). Additionally, News Items on our website can be accessed via the QR code on the Postcard.

The Links referred to on the Postcard are listed in the Notes to Pic03. You can also download a Postcard ‘Handout’ containing the contents from this Post and related links (see Pic01).

As illustrated in Pic04, there is an associated YouTube video (3 Min. 41 Sec. Link: https://youtu.be/y4KMahuBcw0 ); and you can read more about the current status of the S2S/RVRT proposal in our July 2026 Newsletter.

Ongoing support for the Composite S2S/RVRT Shared Pathway is required from local communities, businesses and all tiers of government.

Shorter, localised trail segments (e.g., connecting schools, parks and town centres) are likely to be suitable candidates for existing funding programs; however, non-urban trail segments will require targeted funding – which includes the majority of the outstanding ‘Rail Trail & Wetlands Zone’.

Please express your support for the Composite S2S/RVRT in communications with your local Council and Councillors, and with your State and Federal representatives, especially over the next 6 months during the lead up to the NSW Election (March 2027).

You can also show your support by joining (no fees) or following the RVRT Supporters’ Group.

Separate Posts will provide information about the community events that we are attending and S2S/RVRT funding strategies.

Thanks to all of our RVRT and S2S supporters.

RVRT Supporters’ Group Contacts:
E-mail: [email protected] ; Webpage: https://www.richmondvalerailtrail.org.au/;
Facebook: https://www.facebook.com/richmondrailtrail/ .

M1 Extension Community Open Day - From an RVRT Perspective - Photos from an Afternoon Visit (16/8/2026). Please see the ...
16/08/2026

M1 Extension Community Open Day - From an RVRT Perspective - Photos from an Afternoon Visit (16/8/2026). Please see the individual images for further information - and the other posts for more images from today. See link to Newy's related Reels Post in Comments to first Picture.

Some more Shared images from today's M1 Extension Community Open Day ...
16/08/2026

Some more Shared images from today's M1 Extension Community Open Day ...

M1 Extension - Community Open Day (16/8/2026):  Congratulations to everyone who contributed to making today's event a su...
16/08/2026

M1 Extension - Community Open Day (16/8/2026): Congratulations to everyone who contributed to making today's event a success - and to all of the workers, planners and agencies that have developed and constructed this massive piece of community infrastructure.

Save Link Road Forest Petition ...
14/08/2026

Save Link Road Forest Petition ...

This shows the stepping stones that remain of the green corridor that once linked Sugarloaf through to Glenrock on the coast. A vital corridor for wildlife including insects, birds and bats, but sadly no longer other animals now cut off by roads and dwellings.

Link Road Forest (574 ha) is the largest of the urban green spaces, and the area to west of it has already been rezoned for housing. The NSW govt is now preparing to rezone Link Road Forest.

It's time for the community to stand up and fight for homes for wildlife. Native habitat of this size is an asset for Newcastle, Lake Macquarie, and the Lower Hunter, and once it's gone, we can never get it back.

Our epetition to the upper house of the NSW parliament closes today. This is one way you can add your voice to demonstrate collectively to the government that we don't want housing here. It's already more importantly, providing homes for wildlife.

The link is in our bio and on our website https://linkroadforest.com/

Congratulations to Northern Rivers Rail Trail (NRRT) for developing an iconic trail and for your ongoing engagement with...
31/07/2026

Congratulations to Northern Rivers Rail Trail (NRRT) for developing an iconic trail and for your ongoing engagement with local communities and the many new and returning visitors to the area ...

Our July 2026 RVRT Supporters' Group Newsletter in 5 Pictures:The 5 pairs of pages in this Post should make it easier fo...
22/07/2026

Our July 2026 RVRT Supporters' Group Newsletter in 5 Pictures:

The 5 pairs of pages in this Post should make it easier for you to quickly scan through the July 2026 Newsletter to decide what you want to know more about.

The Nine Keynote Dot Points that were covered in our earlier Post (July 19th 2026) are now marked with red text labels in the Newsletter; these are the issues that we feel have more immediate relevance for advancing the Composite S2S/RVRT proposal and its advocacy - and which you might like to discuss with your friends, colleagues and local elected representatives.

Link to Download the full (10-page PDF, 3.3Mb) Newsletter:https://www.richmondvalerailtrail.org.au/uploads/1/2/0/4/120411157/rvrt_supporters_group_newsletter_july_2026.pdf

Link to the current News items (and Archive) on our webpages: https://www.richmondvalerailtrail.org.au/news

Congratulations (again) to We Ride Australia, Bicycle NSW and all of the other groups who advocated for increased Federa...
22/05/2026

Congratulations (again) to We Ride Australia, Bicycle NSW and all of the other groups who advocated for increased Federal spending on Active Transport. The 'front-loaded' and COAG-based nature of these allocations means that there is approx. $11.2m for NSW during the 2026-27 year (Budget Paper No. 3) ... So, City of Newcastle and other Hunter Councils need to get moving if they hope to secure some of this funding for their Walking and Cycling initiatives.
City of Newcastle
Lake Macquarie City Council
Cessnock City Council
Maitland City Council
Newcastle Cycleways Movement

Budget update 22 May 2026 Infrastructure and Transport Minister Catherine King is changing the game for walking and cycling and...

Address

Kurri Kurri, NSW

Alerts

Be the first to know and let us send you an email when Richmond Vale Rail Trail posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Richmond Vale Rail Trail:

Shortcuts

Share