14/10/2026
Former industrial and rail sites can bring two challenges to a development: managing what has been left in the ground and making sure that ground can support what comes next.
At Auburn, the proposed rail maintenance facility had uncontrolled fill of varying depth and composition. The concern was how that variability might affect settlement beneath the building and rail formation over time.
Our case study looks at how HEIC was used to improve the accessible areas, and how ICM, settlement monitoring and CPT results helped assess the response across the site.
Read the full case study: https://bit.ly/47jKG9n