I2R Group I2R is synonymous with turn key Electrical, Automation and Control projects in the Food and Beverage Industry.

Specialising in Wineries, Dairy, Abattoirs and Cereal processing, I2R has a broad range of skills that will deliver a solution to your needs.

Meet Jonathon Quarisa, a key member of our Automation team here at I2R! Jonathon is now expanding his role by collaborat...
30/09/2024

Meet Jonathon Quarisa, a key member of our Automation team here at I2R!

Jonathon is now expanding his role by collaborating with the Project and Design team on electrical design tasks. With a background as a qualified Electrical Engineer and experience in Software Engineering, he’s taking on exciting new challenges.

We recently sat down with Jonathon to discuss his evolving roleβ€”stay tuned for the full interview on our website! πŸ‘¨β€πŸ’»βœ¨

Due to the remote location of our client, they couldn’t access mains power in a cost-efficient way. We worked closely wi...
23/09/2024

Due to the remote location of our client, they couldn’t access mains power in a cost-efficient way. We worked closely with their project management team to design an off-grid system that could run up to 2 generators at once and have the option of installing a third generator as a backup plan to ensure the plant maintained its 100% operation rate.

Read more about this project here https://bit.ly/47FF0pU

I2R's team designed and manufactured Prefabricated Switchrooms to ensure continuous operation of a plants processing factory.

At I2R, we know how important it is to check in with each other, not just today, but every day. Whether it’s at work or ...
11/09/2024

At I2R, we know how important it is to check in with each other, not just today, but every day. Whether it’s at work or in our personal lives, asking a simple β€œR U OK?” can make all the difference. Take a moment to connect with your colleagues, friends, or familyβ€”it could be the conversation that helps them most.

Have a great Thursday!

🚧 Tricky Installs? No Problem for I2R! We thrive in tight nooks and crannies and we love a good challenge. Shoutout to o...
26/08/2024

🚧 Tricky Installs? No Problem for I2R!

We thrive in tight nooks and crannies and we love a good challenge.

Shoutout to our team for their attention to detail! Thanks to Leeton Shire Council for the kind words and the opportunity to showcase what we do best.

13/08/2024

Project Update: JBS Riverina Beef Plant

We have successfully completed the installation and integration of advanced water flow meters into the Ignition SCADA system at the JBS Riverina Beef Plant.

Our team managed the project as a turnkey solution, overseeing the entire scope, including both electrical and automation work as well as the mechanical installation of flow meters into the existing pipework.

Read more about this project on our website https://bit.ly/JBS_riverina_beef_plant



06/08/2024

π—–π—’π—¨π—‘π—–π—œπ—Ÿ π—‘π—˜π—ͺ𝗦 | π—Ÿπ—˜π—˜π—§π—’π—‘ π—¦π—˜π—ͺπ—˜π—₯ 𝗧π—₯π—˜π—”π—§π— π—˜π—‘π—§ π—£π—Ÿπ—”π—‘π—§ π—₯π—˜π—–π—˜π—œπ—©π—˜π—¦ 𝗠𝗔𝗝𝗒π—₯ π—˜π—Ÿπ—˜π—–π—§π—₯π—œπ—–π—”π—Ÿ π—¨π—£π—šπ—₯π—”π——π—˜π—¦

Council is pleased to announce the completion of a significant electrical upgrade at the Leeton Sewer Treatment Plant (STP), bringing the facility up to current operational and safety standards. ⚑

The plant upgrades were initiated after the existing electrical system, particularly the main switchboard and transformer, were found to be undersized and causing power supply issues.

The project included the replacement and enhancement of the pole, transformer, internal mains, main switchboard, and automation systems. Additionally, the upgrades have provided significant spare capacity for future needs. The project also included the updating of the site’s electrical drawings, and included the installation of power factor correction and active harmonic filtering which will see the site’s power bills reduce. πŸ“‰

The project required a temporary shutdown to facilitate the delivery of these upgrades. While the contract allowed for a maximum shutdown period of 14 days, the actual shutdown was remarkably reduced to just 5 days, with commissioning beginning on the 6th day.

πŸ”— To read the media release in full please click the link below:
https://bit.ly/LSCMRLeetonSTPUpgrades

I2R Group

Project Completed: The Leeton Sewage Treatment Plant Upgrade Installation & Commissioning Phase is complete! βœ… Installed...
03/08/2024

Project Completed:

The Leeton Sewage Treatment Plant Upgrade Installation & Commissioning Phase is complete!

βœ… Installed essential infrastructure, including fibre cables, generator, MSB/MCC, AHF, and SVAR, ensuring robust performance and reliability.
βœ… Successfully managed and coordinated site changeover, including temporary power to ensure no downtime
βœ… Completed detailed acceptance testing and provided commissioning plans
βœ… Successfully commissioned well inside a dedicated 14 day period (5 days)

We now move into our training and ongoing support phase. To read more about this project, visit https://bit.ly/LeetonSewageTreatment

Project Update:The Installation & Commissioning Phase of the Leeton Sewage Treatment Plant Upgrade in full swing! New su...
31/07/2024

Project Update:

The Installation & Commissioning Phase of the Leeton Sewage Treatment Plant Upgrade in full swing!

New supply transformer and mains cabling. New air conditioning, flooring and power quality monitoring and control system.

Stay tuned for ongoing updates as we steam towards the finish line.

We’re proud to share that Sebastian Zanotto has recently earned his Gold Certification in Ignition. This achievement ref...
17/07/2024

We’re proud to share that Sebastian Zanotto has recently earned his Gold Certification in Ignition. This achievement reflects our ongoing commitment to excellence and innovation in SCADA systems.

Head over to our website to learn how Sebastian’s latest expertise enhances our service.

Check out the full story and Sebastian’s Q&A here https://bit.ly/IgnitionCertification

Project Update!Here’s a glimpse into our work at the JBS Beef City Mill Controls Relocation project: - 4 Pin Feeder VSDs...
10/07/2024

Project Update!

Here’s a glimpse into our work at the JBS Beef City Mill Controls Relocation project:
- 4 Pin Feeder VSDs powered up and configured
- 13 E300s powered and configured
- 3 Bucket elevator soft starters replaced with VSDs
- Existing processor replaced with a safety processor and additional cards installed
- Remote rack, safety powered and configured

Great teamwork everyone! πŸ’ͺ

This June, we're taking on The Push-Up Challenge and completing a heap of push-ups between 5-28 June, 2024 to raise fund...
05/06/2024

This June, we're taking on The Push-Up Challenge and completing a heap of push-ups between 5-28 June, 2024 to raise funds and awareness for mental health.

You can show your support by making a tax-deductible donation to our fundraising page or joining our Team to be a part of the fun.

Every dollar helps mental health outcomes in Australia. Donate here: https://www.thepushupchallenge.com.au/fundraisers/i2rgroup

🌺 Lest We Forget 🌺 Today, we pause to honour the sacrifices and bravery of our servicemen and women. Let's reflect on th...
25/04/2024

🌺 Lest We Forget 🌺

Today, we pause to honour the sacrifices and bravery of our servicemen and women. Let's reflect on their courage and dedication, inspiring us to pursue our passions on the land every single day. πŸ‡¦πŸ‡ΊπŸŒΎ

Address

5/27 Collier Street
Griffith, NSW
2680

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Alerts

Be the first to know and let us send you an email when I2R Group posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share