ANR Engineering

Directions Website

ANR Engineering Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from ANR Engineering, Construction Company, Suite 2212, 31B Lasso Road, Gregory Hills.

13/10/2026

The work you do not always see; done by the team that never compromises on how it gets done.

ANR Engineering is on the ground at Bennett Park, Narwee, delivering essential drainage renewal works that will serve this community for years to come.

Complex ground conditions. Strict safety controls. And a team that gets it done properly, every step of the way.

We know civil.

ANR Engineering is hiring! We’re looking for experienced formworkers and concreters to join the team.Ready to get to wor...
10/10/2026

ANR Engineering is hiring!

We’re looking for experienced formworkers and concreters to join the team.

Ready to get to work?
Call, text or email us now!

Safety means identifying risks early and putting the right controls in place.At Bennett Park, ANR Engineering managed co...
08/10/2026

Safety means identifying risks early and putting the right controls in place.

At Bennett Park, ANR Engineering managed complex drainage renewal works involving deep excavation, existing infrastructure removal and the installation of new stormwater systems.

When asbestos-contaminated material was identified, our team implemented controlled-access zones, decontamination procedures, respiratory protection and air monitoring to safely manage the risk throughout the works.

For ANR Engineering, delivering infrastructure is about more than completing the project. It’s about protecting our people, protecting the community and ensuring every stage of delivery is carried out responsibly.

We know civil.

06/10/2026

Civil construction is not always straightforward. At ANR Engineering, how we handle complexity is what sets us apart.

At Bennett Park in Narwee, our team is delivering significant drainage renewal works such as deep excavation, removal of existing drainage infrastructure, installation of new stormwater pipes and pits, backfilling, and full reinstatement of the surrounding area.

During the project, testing confirmed the presence of asbestos-contaminated material within the work area. Managing this safely became a critical part of our delivery and we did not cut corners.

ANR implemented a comprehensive suite of controls: a dedicated on-site decontamination unit, strict exclusion zones, required respiratory protection and PPE for all personnel, continuous air monitoring, and controlled removal of all contaminated material. Plant, equipment, and personnel are fully decontaminated before leaving the controlled area every time.

Delivering infrastructure is about more than completing the physical works. It is about recognising the risks that come with complex construction environments and having the people, systems, and controls in place to manage them properly.

At Bennett Park, that is exactly what we are doing.

We know civil.

Out on site, working together and keeping the details in check.Every project is a team effort, and we’re proud of the pe...
03/10/2026

Out on site, working together and keeping the details in check.

Every project is a team effort, and we’re proud of the people behind ANR Engineering.

Planning your next project? Get in touch with our team.

02/10/2026

A full intersection upgrade. One contractor. Delivered to the highest standard.

At Miller Road in Villawood, ANR Engineering delivered a complete roundabout upgrade for Canterbury-Bankstown Council by improving traffic flow, pedestrian safety, and long-term road performance for the thousands of drivers, cyclists, pedestrians, and bus passengers who move through this intersection every day.

The scope covered it all. New roundabout construction and road realignment. Asphalt resurfacing. Concrete kerb and gutter, footpaths, driveways, and raised median islands. New signage and pavement markings. Significant stormwater drainage upgrades. And the careful relocation of telecommunications services to accommodate the new road alignment -- all without impacting surrounding infrastructure.

Delivered through detailed coordination with utility authorities, Council representatives, and key stakeholders, all with access maintained for the local community throughout.

This is what end-to-end civil construction looks like.

We know civil.

Safety is more than a process. It’s a commitment embedded into every project we deliver.At ANR Engineering, we believe s...
01/10/2026

Safety is more than a process. It’s a commitment embedded into every project we deliver.

At ANR Engineering, we believe safe outcomes are created through strong systems, clear communication and a team that looks out for one another.

From planning and preparation through to delivery on site, we prioritise the safety of our people, our partners and the communities we work in.

This National Safe Work Month, we recognise that a strong safety culture is built by everyone.

We know civil.

ANR Engineering delivered the civil construction works for the Miller Road Roundabout upgrade, transforming the existing...
30/09/2026

ANR Engineering delivered the civil construction works for the Miller Road Roundabout upgrade, transforming the existing intersection to improve traffic flow, pedestrian safety, and long-term infrastructure performance.

The project involved the construction of a new roundabout, road realignment, pavement reconstruction, asphalt resurfacing, new kerb and gutter, footpaths, driveways, raised median islands, signage, and pavement markings.

Extensive stormwater upgrades and careful coordination of telecommunications relocations were also completed to support the new road alignment while maintaining access and minimising disruption for the local community.

Through detailed planning, strong stakeholder coordination, and a commitment to quality, safety, and environmental compliance, ANR Engineering delivered a safer, more efficient connection for all road users.

We know civil.

Transforming infrastructure, one connection at a time.The Tamarama Marine Drive project focused on improving accessibili...
17/09/2026

Transforming infrastructure, one connection at a time.

The Tamarama Marine Drive project focused on improving accessibility, safety, and connectivity through a range of civil upgrades, including improved access ramps, pedestrian crossings, upgraded lighting, bus shelter integration, footpath improvements, and renewed road surfaces.

Every detail plays a role in creating safer, more functional spaces for the community to move through and enjoy.

At ANR Engineering, we deliver infrastructure solutions built with precision, purpose, and long-term value.

We know civil.

15/09/2026

What makes ANR Engineering different?

It’s the people behind the projects.

A diverse, dynamic and passionate team working together to deliver infrastructure solutions across communities.

Take a look behind the scenes and meet some of the people who make ANR Engineering what it is.

We know civil.

Address

Suite 2212, 31B Lasso Road
Gregory Hills, NSW
2557

Alerts

Be the first to know and let us send you an email when ANR Engineering posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share