18/06/2026
❄️ Brand New custom built Diamond air 17kw water cooled system for this new high rise unit. Replacing the original unit from 1988. With the Cooling tower drained and having the chance to do so we replaced the original isolation and balancing valves ensuring longevity in the system.
✅ Another repeat customer happy and satisfied.