01/09/2026
Good view here of our full uncoupled slab build-up on the Greensborough project. Starting from the bottom: 100mm XPS insulation, then a 150mm suspended slab on top. The slab is rebated at the sliding door opening so when the door is installed we get a completely flush transition from inside to out. No lip, no step, no compromise.
The detail that matters most here is at the slab edge. You can see 50mm XPS running around the outside, and the bottom plate of the frame is actually hanging over that insulation. That is not a mistake. That is what gives us a continuous layer of insulation around the full perimeter of the slab with no gap and no thermal bridging. Cold cannot find a path through.
While the carpenter has been framing, they have also been installing the wall wrap underneath the bottom plate. The wrap on this project is Protec Wrap SV, which is adhesive backed, so it bonds directly onto the termite barrier sitting beneath it. The wrap tucks under the plate and ties the whole building envelope together from the slab up.
Every layer has a job. None of them work without the others.