23/10/2026
π BUILDER TIP | ACCESS & SET-DOWN CHECKLIST
Before the truck arrives with your roof trusses, floor trusses or wall frames, take a few minutes to check the site.
ACCESS CHECK
β Can the delivery vehicle enter and leave safely?
β Is the driveway or street clear?
β Are there low branches, overhead power lines or gates to consider?
β Are parked cars or other obstacles restricting access?
β Is the ground suitable for the delivery?
SET-DOWN CHECK
β Is there a clear, level and safe area for unloading?
β Is there enough room to unload the materials?
β Is the area practical without interfering with other trades or machinery?
If access is tight or your site has limited space, let your supplier know early. Staged delivery may also need to be considered on larger or restricted sites. (TrussFab)
π Read the full checklist and find out what to prepare before delivery day:
https://www.trussfab.com.au/how-to-prepare-your-site-for-delivery
Built Properly. Measured Properly.
Australian Made & Australian Owned