Future Engineering & Communication Australian based organisation that specialises in design, supply & installation of Powerline Infrast Call us for a quote today!

Future Engineering & Communication Pty Ltd is an Australian based organisation that specialises in Powerline Construction and the design, supply and installation of Lattice Towers, Steel Monopoles and Guyed Masts. Our factory in Cockburn Central, Western Australia, uses quality Australian materials provided by accredited suppliers to manufacture a full range of superior quality Lattice Towers, Poles, Guyed Masts and Accessories. At the same facility, we also manufacture; Custom Designed Structures, Telescopic Masts, Mobile Structures and Roof Top Structures. All products come complete with a full range of accessories. All our products are supported with detailed design & drafting, project management, manufacturing, installation, quality and maintenance systems.

The team has successfully completed a 50m tower installation on a greenfield site, marking another great milestone for t...
05/10/2026

The team has successfully completed a 50m tower installation on a greenfield site, marking another great milestone for the project. ๐Ÿ‘

With this site now complete, attention will turn to the next location, with works set to kick off during the next swing.
A fantastic effort from the crew and a strong result all round. ๐Ÿ’ช

Tower and foundation strengthening works are now 80% complete, with the team making excellent progress on site. ๐Ÿ’ชWhile w...
30/09/2026

Tower and foundation strengthening works are now 80% complete, with the team making excellent progress on site. ๐Ÿ’ช

While weather delays have required a return visit to finalise the remaining works, the crew has done a fantastic job keeping the project moving and delivering strong results so far. ๐Ÿ‘

A huge effort from the FEC crew during a single two-week swing in August. ๐Ÿ‘The team closed out the remaining punch list ...
25/09/2026

A huge effort from the FEC crew during a single two-week swing in August. ๐Ÿ‘

The team closed out the remaining punch list items across two sites, leaving both ready for client handover, while also making significant progress at another site by completing the tower and CER earthing, pre-assembling the 40m tower, and getting it erected.

Despite multiple priorities and workfronts, the crew stayed agile, kept the job moving, and delivered everything planned for the swing, and more.

A fantastic result that has the team well-positioned heading into the next stage of works. ๐Ÿ’ช

Our crew recently completed mast and foundation strengthening works at a very remote site, delivering a great outcome un...
21/09/2026

Our crew recently completed mast and foundation strengthening works at a very remote site, delivering a great outcome under challenging conditions. ๐Ÿ’ช

The team constructed new guy anchors using precast blocks for two of the anchor points, while the third was embedded into existing boulders on site.
In addition, all existing guy tensions were found to be very high and were adjusted to meet the engineer's requirements.

Considering the remote location and site conditions, the crew did a fantastic job and should be proud of the result. ๐Ÿ‘

The team recently returned to an SA wind farm to complete a full replacement of the wind systems across all three Met Ma...
16/09/2026

The team recently returned to an SA wind farm to complete a full replacement of the wind systems across all three Met Masts on site. ๐ŸŒฌ๏ธ

The re-commissioning of the new equipment and logger cabinets was completed smoothly, with a great outcome across all three sites. ๐Ÿ‘

A big thank you also to TAMS for their support in reconnecting the 230V AC power and completing the ECoCs seamlessly. A great example of collaboration delivering successful results. โœ…

On the way home from a recent WA project, one of our team members made a quick pit stop at a WA wind farm to relocate a ...
11/09/2026

On the way home from a recent WA project, one of our team members made a quick pit stop at a WA wind farm to relocate a valued client's LiDAR that was sitting idle and not collecting data. ๐ŸŒฌ๏ธ

It was a great opportunity to pivot during demobilisation and assist the client at short notice, ensuring the equipment was back in position and ready to get to work.

A simple adjustment, a happy client, and a great result all round. ๐Ÿ‘

๐Ÿ› ๏ธ Progress update from the FEC team!The crew are progressing through tower and foundation strengthening works in countr...
07/09/2026

๐Ÿ› ๏ธ Progress update from the FEC team!

The crew are progressing through tower and foundation strengthening works in country Victoria, delivering important structural upgrades to improve the structureโ€™s reliability and longevity. ๐Ÿ’ช

The team has continued to make steady progress while adapting to challenging weather conditions, demonstrating the resilience, professionalism and commitment that goes into every FEC project.

Weโ€™re looking forward to seeing this one progress through to completion! ๐Ÿ‘

๐Ÿ—ผ Keeping infrastructure performing at its best!The FEC team recently completed inspections across three Met Masts, alon...
03/09/2026

๐Ÿ—ผ Keeping infrastructure performing at its best!

The FEC team recently completed inspections across three Met Masts, along with replacement of equipment to help maintain reliable site performance. ๐Ÿ’ช

With ongoing monitoring and support required across critical infrastructure, the team will continue working through any additional requirements to keep everything operating at its best.

Great work by the crew on another successful maintenance visit! ๐Ÿ‘

๐Ÿ—ผ Another impressive Met Mast build completed by the FEC team!One of our crews headed out to deliver another 160m Met Ma...
01/09/2026

๐Ÿ—ผ Another impressive Met Mast build completed by the FEC team!

One of our crews headed out to deliver another 160m Met Mast installation and made the most of the conditions, progressing efficiently through the build and showcasing their expertise from start to finish. ๐Ÿ’ช

The team's performance impressed everyone on site, with their professionalism, skill and commitment to delivering a quality outcome standing out throughout the project.

Well done to the crew on another fantastic build! ๐Ÿ‘

๐Ÿ’ช A massive effort from the FEC team to deliver another challenging project!The crew recently completed foundation stren...
28/08/2026

๐Ÿ’ช A massive effort from the FEC team to deliver another challenging project!

The crew recently completed foundation strengthening works, overcoming significant water management challenges due to the site conditions.
After several days of pumping and preparation, the team was able to establish the base required for formwork and reinforcement works to proceed.

The final stages saw the crew complete a 56mยณ concrete pour, strip formwork and leave the site ready for handover. ๐Ÿ‘

The team's hard work, persistence and commitment to getting the job done even earned a mention in the client's newsletterโ€”a fantastic recognition of the effort that went into delivering this project.

Great work, team!

Address

7 Tamara Drive
Cockburn Central, WA
6164

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

+61894174999

Alerts

Be the first to know and let us send you an email when Future Engineering & Communication posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share