🏥 Critical Hospital Hot Water Upgrade 🔧🔥
Our team recently completed a hot water plant circulating pump upgrade at a major hospital — all within a tight shutdown window. ⏱️
The works involved isolating the hospital’s hot water feed and return lines, removing the existing faulty pump set and controllers, and installing a new REEFE 32 dual hot water circulating pump set. 💧🔧
Pipework was modified to suit the new installation, hot water pipework re-lagged, and the entire system thoroughly tested and commissioned before being brought back online. ✅
With essential services like these, planning, efficiency and safety are critical. Our team worked together to minimise downtime and restore the hospital’s hot water supply as quickly and safely as possible.
Another critical shutdown completed safely and on time. 💪👏