19/08/2026
The YARA Co team completed a specialised concrete remediation package within the National Gallery of Australia's Stormwater Retention Tank, working inside a confined space with restricted access to restore structural integrity and extend the asset's service life.
The scope included hydro demolition at 20,000 psi to remove a defective waterproof membrane and deteriorated concrete, treatment of exposed reinforcement, placement of a low shrink concrete topping,
and reinstatement of the waterproof membrane system.
Restoring critical infrastructure where access is anything but simple. Every stage required careful planning, precision, and strict adherence to safety protocols, demonstrating the team's capability to deliver complex remediation works in challenging environments.
National Gallery of Australia, Canberra