21/05/2026
Utility installation done right.
Ultegra has commenced works on a private high-voltage network for a new private storage facility in Moorebank, with our crews currently progressing through the 33kV conduit trenching and conduit bank installation.
Working alongside New Edge Group and Richard Crookes Constructions, our civil and traffic teams are delivering critical early infrastructure to support the site’s future electrical network.
Scope of works includes:
• Excavation and construction of HV and shared service trenches
• Installation of underground 33kV conduit banks.
This phase involves approximately 900m of HV conduit trenching and over 2.9km of shared service trenching.
Proud to see strong collaboration across all crews onsite. A big thanks to everyone involved for maintaining a focus on safety, quality, and efficient delivery.