07/09/2026
Thanks to Ben and the team at Albury Plumbing Services for trusting us in helping bring there new shed to life. 26 concrete tilt panels with over 600m2 of tilt panels poured. Most panels standing 9m tall and 3.5m wide. Thanks to Jordan from Widweld Fabrications for coming and helping out with some on site welding and boom operating. Can't wait to see the finished product.