Eireann Engineering

Directions Website

Eireann Engineering Eireann Engineering is a welding company in Adelaide SA. Specialising in workshop fabrication and onsite welding and fitting works.

Rail temporary works demolition 👨‍🏭💪
04/06/2026

Rail temporary works demolition 👨‍🏭💪

Bolt down precast anchor plates
21/05/2026

Bolt down precast anchor plates

11/05/2026
21/11/2025

Friday feeling 😎

Need any plant repairs. Modifications done?Get in touch. 0410181195
29/10/2025

Need any plant repairs. Modifications done?
Get in touch.
0410181195

23/10/2025

Boilermakers/Welders wanted for workshop and onsite works for Adelaide’s T2D project,
Must have minimum 3 years welding experience,
Drivers licence is an advantage but not essential,
Must have White card or willing to obtain one,
If this interests you, please get in contact,
Call Ken- 0410181195
Email- [email protected]

20ft shipping containers cut down and reinforced for use as protection walls for hoppers but also the back wall of the l...
23/10/2025

20ft shipping containers cut down and reinforced for use as protection walls for hoppers but also the back wall of the loading ramp.

Containers will be positioned along the front of the mobile hoppers.

Concrete tele blocks will sit on the floor of the container.

Filling will be tipped into the containers and back along maybe 10-15meters out into the yard area until the ramp is long enough to load the hoppers safely with the loading shovel. The back wall of the containers will protect the hoppers from being damaged with the filling/stones etc.

If you need any maintenance or modifications done to your onsite plant and equipment, please get in touch

20ft shipping containers cut down and reinforced for use as protection walls for hoppers but also the back wall of the l...
23/10/2025

20ft shipping containers cut down and reinforced for use as protection walls for hoppers but also the back wall of the loading ramp.
Containers will be positioned along the front of the mobile hoppers.
Concrete tele blocks will sit on the floor of the container.
Filling will be tipped into the containers and back along maybe 10-15meters out into the yard area until the ramp is long enough to load the hoppers safely with the loading shovel. The back wall of the containers will protect the hoppers from being damaged with the filling/stones etc.
If you need any maintenance or modifications done to your onsite plant and equipment, please get in touch .

Address

67 Plymouth Road, Wingfield
Adelaide, SA
5013

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm
Friday 7am - 5pm
Saturday 7am - 5pm

Alerts

Be the first to know and let us send you an email when Eireann Engineering posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share