01/06/2026
Another successful installation completed.
The Airevolution team removed old, rusty ductwork and safely capped the existing system before upgrading the space with a brand-new evaporative cooler. The new unit was installed alongside the previous setup, complete with new ductwork and air diffusion positioned directly above a critical workstation to improve comfort and airflow where it matters most.
A cleaner system, better performance, and improved working conditions for the team on site.
For reliable industrial cooling solutions, talk to Airevolution today. https://airevolution.com.au/