Abyar Ali Foundation Contracting - أبيار علي لحفر الأساسات

Abyar Ali Foundation Contracting - أبيار علي لحفر الأساسات Your ideal partner for foundation equipment. Supplying reliable used piling & foundation equipment with warranty, inspection, expert consultation.

and after-sales service. Contact us for reliable solutions for your projects.

Model: INTEROC AN 74 (2012 Model | Made in Germany)Engine Power: DEUTZ F6L 912 Air-Cooled Diesel | 74 kW (~100 HP) @ 2,3...
07/09/2026

Model: INTEROC AN 74 (2012 Model | Made in Germany)
Engine Power: DEUTZ F6L 912 Air-Cooled Diesel | 74 kW (~100 HP) @ 2,300 RPM
Chassis & Rig Type: Heavy-Duty Hydraulic Crawler Anchor / Micro-piling Drilling Rig
Equipped with a 6-cylinder air-cooled Deutz engine and heavy-duty steel tracks for extreme terrain stability. Perfectly fit for anchor drilling, micro-piling, soil nailing, and rock bolting operations.

✅ Fully maintained and jobsite ready. Ideal for deep foundation, geotechnical drilling, and slope stabilization projects with high torque and reliable performance at a cost-effective price.

🌐 www.abyarfoundation.com
📩 [email protected]
http://wa.me/971521818602

Model: Colcrete 4/10 (2015 Model | Made in UK)Total Weight: 1.5 Ton (1,500 kg) Heavy-Duty Skid FrameTechnology: High-She...
31/08/2026

Model: Colcrete 4/10 (2015 Model | Made in UK)
Total Weight: 1.5 Ton (1,500 kg) Heavy-Duty Skid Frame
Technology: High-Shear Colloidal Mixing Action & Integrated Control Panel
Equipped with high-speed centrifugal mixing pump, heavy-duty steel manifold piping, and manual changeover valves. Perfectly fit for tie-back anchor grouting, micro-piling, soil nailing, rock bolting, and dam curtain grouting.

✅ Fully maintained and ready for jobsite operation. Ideal for deep foundation, tunnel consolidation, and structural void filling, offering efficient high-shear slurry production at a cost-effective price.

🌐 www.abyarfoundation.com
📩 [email protected]
http://wa.me/971521818602

Model: BARKOM BRK-250 (2020 Model)Motor Power: 11 kW Industrial ElectricMax Pressure: 100 Bar | Max Flow Rate: 100 L/min...
28/08/2026

Model: BARKOM BRK-250 (2020 Model)
Motor Power: 11 kW Industrial Electric
Max Pressure: 100 Bar | Max Flow Rate: 100 L/min
Equipped with High-Shear Colloidal Mixer, Agitator Holding Tank, and Hydraulic Piston Pump on a mobile towable chassis. Perfectly fit for soil injection, grouting, and foundation consolidation works.

✅ Fully maintained and ready for site operation. Ideal for deep foundation, ground improvement, and rock grouting projects, offering reliable high-pressure performance at a cost-effective price.
🌐 www.abyarfoundation.com
📩 [email protected]
http://wa.me/971521818602

Putzmeister P 13 Piston Pump | Heavy-Duty Mortar & Plastering MachineDesigned for continuous operation and demanding con...
28/08/2026

Putzmeister P 13 Piston Pump | Heavy-Duty Mortar & Plastering Machine

Designed for continuous operation and demanding construction environments.

Technical Specifications:

• Type: Dual-Piston Mechanical Pump
• Drive: Diesel or Electric Motor
• Maximum Pressure: 40 bar
• Maximum Grain Size: 8 mm
• Delivery Range: 300 m Horizontal / 100 m Vertical
• Applications: Mortar, Plastering & Cement Grouting
• Condition: Fully Maintained & Inspected
• Location: UAE

Reliable pumping performance for demanding site operations.

Contact us for technical details or equipment availability.
http://wa.me/971521818602

Weak soil should never stop your project.Poor ground conditions can lead to settlement, reduced stability, structural co...
12/08/2026

Weak soil should never stop your project.

Poor ground conditions can lead to settlement, reduced stability, structural concerns, and costly project delays.

At Abyar Ali Foundation Contracting, we provide professional soil improvement through injection, helping improve ground conditions and support foundation requirements according to project needs.

Why choose our injection solutions:
✔ Fast response to challenging site conditions
✔ Well-maintained equipment
✔ Accurate and controlled ex*****on
✔ Reliable performance under demanding conditions

Supported by 15+ years of technical experience, our team delivers dependable injection solutions for critical foundation and construction projects.

Contact us for professional soil injection solutions.

Successful Project Delivery | SOBHA SINIYA ISLAND – Phase 02Abyar Ali Foundation Contracting completed the Vertical Stat...
06/08/2026

Successful Project Delivery | SOBHA SINIYA ISLAND – Phase 02

Abyar Ali Foundation Contracting completed the Vertical Static Load Test using the Crown Method for the Proposed SOBHA SINIYA ISLAND – Phase 02 project in Umm Al Quwain, delivering reliable testing services to support the project's foundation requirements.

We value the confidence placed in our team and remain committed to delivering dependable foundation testing solutions.

Excavation safety starts with a reliable anchoring system.Unstable soil conditions can lead to ground movement, structur...
02/08/2026

Excavation safety starts with a reliable anchoring system.

Unstable soil conditions can lead to ground movement, structural risks, and costly project delays.

At Abyar Ali Foundation Contracting, we provide professional
Shoring Anchors and Ground Anchors designed to deliver safe and dependable excavation support.

Why choose our anchoring solutions?

✔ Fast response to site requirements
✔ Well-maintained anchoring equipment
✔ Accurate ex*****on within project timelines
✔ Reliable performance in demanding site conditions

Backed by over 15 years of field experience, we help contractors and developers complete excavation works with confidence.

Contact our team to discuss your project requirements.

Manual Hand Pump – 2-Way Hydraulic SystemReliable hydraulic pressure control for load testing, anchoring, and stressing ...
17/06/2026

Manual Hand Pump – 2-Way Hydraulic System

Reliable hydraulic pressure control for load testing, anchoring, and stressing applications.

Specifications:
• Working Pressure: 700 bar
• 2-Way Valve System
• 50/20 cm³ Displacement per Stroke
• Weight: 20 kg

✔ Suitable for testing and anchoring operations
✔ Inspected and ready for use
✔ Available in UAE

Contact us for availability and technical details.

Successful foundation projects depend on accurate testing, reliable equipment, and experienced technical teams.Abyar Ali...
13/06/2026

Successful foundation projects depend on accurate testing, reliable equipment, and experienced technical teams.

Abyar Ali Foundation Contracting provides specialized foundation solutions including:

✔ Foundation Testing
✔ Anchoring Systems
✔ Micro Piles
✔ Engineering Services
✔ Equipment Rental & Sales

Supporting contractors and developers across the UAE with dependable ex*****on and technical expertise.

Contact us to arrange professional services for your project.

27/05/2026

Address

Al Faya Yard, P. O. Box
Abu Dhabi
63101

Alerts

Be the first to know and let us send you an email when Abyar Ali Foundation Contracting - أبيار علي لحفر الأساسات posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Abyar Ali Foundation Contracting - أبيار علي لحفر الأساسات:

Shortcuts

Share