19/08/2026
We completed this ring feed and taps system inside a townhouse estate. The estate already had a borehole and tanks system. We upgraded the pressure pump from a 1.1kw to a 2.2kw vsd pump and ran a 770m ring feed system, we had to open and close around 300m of paving and ran the rest of the pipe including all the joints and fittings inside the gardens to make sure it is serviceable. We installed taps at selected points where the estate and the residents can access the borehole water. If you are in need of water surveying, borehole drilling, yield testing, pump installations or water quality testing call us on 076 277 6303 or visit our website on www.aquacoredrilling.co.za