Here’s a look at what we’ve been working on over the past few days at our project in Canton, NC!
So far, we’ve installed a culvert pipe, cut in a new driveway, and brought in two loads of ballast. We’ve also moved a large debris pile out of the way that will be burned at a later date. We’ve felled several trees on the upper side of the property and got everything cut up.
The plan for the rest of the week is to chip as much of the tree debris as possible, spread two loads of crusher run on the new driveway, and install the septic lines.