The Oak Lawn Public Works project in Village of Oak Lawn, Illinois - Government, highlights a tailored stormwater solution designed to meet complex site constraints and storage requirements. The 8’-11’ DoubleTrap detention system provides a total storage capacity of 109,188 cubic feet and incorporated a watertight liner. In addition to the DoubleTrap system, two flanking VCBMP 2’-1” SingleTrap vaults were installed in order to promote and reach required infiltration volumes.
Application: Detention and Infiltration | Product used: 2’-1” SingleTrap and 8’-11” DoubleTrap | Total Water Stored:109,188 cf | Number of Basins: 3 | Number of Pieces: 166, 82, 43 | Foundation: Stone | Consulting Engineer: RTM Engineering Consultants | Installing Contractor: TBS Construction Inc | General Contractor: Harbour Contractors, Inc.