We had a hectic fortnight squeezing in this supply & fit project for a new restaurant upstairs in Thompsons Nightclub bu...
06/06/2026

We had a hectic fortnight squeezing in this supply & fit project for a new restaurant upstairs in Thompsons Nightclub building, Belfast. This was our 3rd & final phase of work in this building over the past couple of years.

This job had a strict deadline which need met, working along side M&E on site.

- The pitched ceilings received an MF system, rockwool slab above, 50mm kingspan & wallboard below.

- Exterior liners received 2x2 timber, 50mm kingspan between, a layer of VCL and plasterbaord to face.

- Internal partitions built with 90mm stud, rockwool slabs and 18mm plywood Patressing internal with wallboard finish.

- Staircase from GF- 1st got gypliner system with MF ceiling for the new entrance.

- 2 new Fire escape routes built.

- New Unisex toilets built, with MF ceilings to
Complete the fitout.

All our plasterboard received a T&J finish, ready for the painter.

All the best to Aughrim Build and the owners of Thompsons as the finishing fitout now starts.

🤝 ✅

18/04/2026

We’re really happy to have been a part of this transformation from the old dated shop to the new modern style. The finished article looks, clean, crisp & spacious for shoppers.

All the best Wallace Coleraine.

The first 2 houses supplied & fitted with 230 sq/m of MF Ceilings today in Portadown for Sheriff Homes. This is our 3rd ...
11/04/2026

The first 2 houses supplied & fitted with 230 sq/m of MF Ceilings today in Portadown for Sheriff Homes.

This is our 3rd site of ceilings for this client with another to start later in the year.

What a turnaround in just over 3 weeks. We recently finished our supply & fit internal fitout package in the new Wallace...
04/04/2026

What a turnaround in just over 3 weeks.

We recently finished our supply & fit internal fitout package in the new Wallace Suit Shop in Coleraine.

Our scope on this one:

- Metal stud partitions & liners
- MF ceilings & bulkheads
- 1/2 height display walls
- All access panels
- FR lobby downstairs between 2 buildings
- Tape & Joint finish
- All remedial work to older walls

All walls were built with plywood and plasterboard to future proof the new shop for changes down the line.

The work consisted of large center spine wall to add more shopping space, 5 new changing rooms, a store room along with giving the entrance of the shop a revamp.

The finished product has turned out great.

This is our 2nd project for this client with a 3rd in their Ballymena shop in the not so distant future.

🔨 Fixers Required, Belfast City Centre Hotel Project.✅ Work secured through 2026.💰 Work 1 week in hand -> paid weekly af...
25/03/2026

🔨 Fixers Required, Belfast City Centre Hotel Project.

✅ Work secured through 2026.

💰 Work 1 week in hand -> paid weekly after.

🎯 Competitive rates.

📞 Get in touch if interested.

We braved the elements over the past fortnight completing this courtyard elevation of SFS stud WorkIn the new Strüle Cam...
20/02/2026

We braved the elements over the past fortnight completing this courtyard elevation of SFS stud Work
In the new Strüle Campus in Omagh for Ard Contracts.

Work included in this one:

- 350 sq/m of SFS exterior stud & Klasse G Board
- Window & door jambs formed
- Z bars fixed to steel beams

Onto the next…

Another job complete. 🔨 ✅ These 5 bed sit apartments complete for KEMConstruction in Dungannon, Co. Tyrone, along with e...
27/01/2026

Another job complete. 🔨 ✅

These 5 bed sit apartments complete for KEM
Construction in Dungannon, Co. Tyrone, along with electrical switch room, entrance lobbies & communal corridors.

Work included in this fitout:

- Single & Twin acoustic metal stud partitions
- Walls liners
- MF ceilings
- Grid Ceilings
- Bulkheads
- Plywood grounds
- Column Encasements
- Acoustic Insulation
- Fire taping

Another job compete on time and to a high standard.

Another one finished up before the Holidays.We helped design, supply & build this new office fitout for Dungannon Plant ...
10/12/2025

Another one finished up before the Holidays.

We helped design, supply & build this new office fitout for Dungannon Plant Sales in Ardboe, Co. Tyrone.

Work included in this one:

- 70mm Metal Stud partitions & exterior liners
- MF ceilings
- Plywood grounds
- Feature LED bulkheads
- Acoustic Insulation
- FR partition formed to the peak to split the office & workshop
- Timber Joist Ceiling above corridor for M&E future access

Ready for T&J finish now.

🔨 🧰 ✅ 🤝

Our 45 mixed 1, 2 & 3 bed apartments in Dunmurray for KEM Construction is nearing completion.We are still currently work...
16/10/2025

Our 45 mixed 1, 2 & 3 bed apartments in Dunmurray for KEM Construction is nearing completion.

We are still currently working in the communal areas and corridors with work due finished in the next 2/3 weeks.

There has been a serious push with this job only starting over 4 months ago.

Work included in this one:

- Metal stud Partitions
- Plasterboard
- Plywood grounds (walls & ceilings)
- Insulation (PIR, Foil & acoustic)
- Air tightness (Membranes & tapes)
- MF Ceilings
- Bulkheads
- Fire taping
- Liner walls
- Fire protection to steel beams

🔨 🧰🪜🪚

We got the first phase of work complete on this grand new build house outside Draperstown this week. The upstairs ceilin...
06/06/2025

We got the first phase of work complete on this grand new build house outside Draperstown this week.

The upstairs ceilings were complete with Plasterboard and the master bedroom had a surround LED bulkhead formed.

The downstairs received MF ceilings, plasterboard and 2 different styles of bulkheads in the kitchen snd snug area.

The 2 vaulted ceilings in the sunrooms received the usual 100 & 50mm kingspan and plasterboard.

All work was carried out to a high standard - with a happy client & ready for plaster.

We will be returning at a later date to form a TV media wall, fire rate and box steel beams above door ways to leave ready for skimming, complete the air tightness taping to windows & doors as well as the PIR floor insulation and polythene.

All the best with the rest of the build.

🔨 🏠 🤝

Address


Website

Alerts

Be the first to know and let us send you an email when ROKit Contracts posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to ROKit Contracts:

  • Want your business to be the top-listed Contractor?

Share