10/14/2026
What actually happens in a service upgrade, since people ask.
Four pieces: the service riser, the meter socket, the service entrance cable, and the main breaker panel. The utility drop gets cut, the new equipment goes in, and everything outside is built with weather resistant materials meant to last.
You also end up with a surge protection device in the panel and a service receptacle next to it, which most older setups never had.
But the first step is not any of that. The first step is a conversation about how and why you want it done, so we can size it right. Sometimes 100 amp is genuinely fine. Sometimes you have an electric stove, electric dryer, electric water heater and a hot tub, and 200 is the honest answer.
Worcester and surrounding towns. Free estimate at (508) 735-7245.
https://f.mtr.cool/yjjh5gm1nr