CPMZone Project Manager in construction industry interested in spreading knowledge and experiences. Talk about all things construction and some technology.

Support me on ko-fi: https://ko-fi.com/cpmzone

New video just dropped! Come check it out!
06/21/2026

New video just dropped! Come check it out!

After visiting the site throughout the week, it seems there is actu...

New video dropped right now! Come check out who will be staying where they are now on the property.https://youtu.be/hsGr...
06/08/2026

New video dropped right now! Come check out who will be staying where they are now on the property.

https://youtu.be/hsGr8hF9JCg

What is going to happen to the current companies doing business on ...

06/04/2026

Based on current site conditions, it looks like the main focus of the work is inside the main structure to excavate and haul off debris related to the safe-off and removal of utilities not scheduled to remain (if any). Another sign of this work is on the Macy’s side where the gravel is stockpiled. At the end of this video you can see that the piles have been disturbed are now smaller. You can also see the front cab of a dump truck in the loading dock near the lower-level North entrance.

05/26/2026

Looks like the team has been busy making sure there is little debris to drive around outside. Also, they took the liberty of removing the remaining trees from the upper level Sears parking area.

Support my work and keep my drones happy by buying us a coffee: https://ko-fi.com/cpmzone

05/19/2026

This footage was filmed on Friday at the end of the work day. Looks like they have been busy cleaning up and hauling debris during the week. Can't wait to see what they start piling up this week!

Support my work and keep my drones happy by buying us (me) a coffee: https://ko-fi.com/cpmzone

Check me out on the socials
Facebook:
https://www.facebook.com/profile.php?id=61588909873964

Instagram:
https://www.instagram.com/cpmzome/

X:
https://x.com/tcpmzone

Catch me streaming live on Twitch or YouTube

Twitch:
https://www.twitch.tv/thecpmzone

YouTube:
https://www.youtube.com/-g3c

05/15/2026

New large piles of dirt by Macy's and growing debris piles. Demolition is ongoing prior to the tear sown of the exterior.

Help support this channel and keep the drones flying, buy me a coffee: https://ko-fi.com/cpmzone

Just posted a new video showing the current state of the Westminster Mall. Check it out!
05/12/2026

Just posted a new video showing the current state of the Westminster Mall. Check it out!

Footage from the west to north side of the mall. Currently all of the work is being conducted on these sides as they are out of sight of most people. You can...

05/09/2026

North side lower level entrance. The demolition company has hung the Stars n' Stripes as they continue to make something new on an old site.

05/09/2026

This is what is happening as the demolition continues inside the structure. All debris is being hauled out through the north side, or the "back" of the building.

Address

Westminster, CA
92683

Alerts

Be the first to know and let us send you an email when CPMZone posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share